City of Dallas permits indicate plumbing work on the sewer line and work for a backup generator at this residence. The sewer re-pipe permit was filed March 9, 2026; plumbing and electrical permits for the generator were filed September 16, 2026.
Summarized from City of Dallas records · updated Sep 16, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 16, 2026
- since Mar 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 723 Skillman St
What work is permitted at 723 Skillman St?
City of Dallas records list a sewer re-pipe from the yard to the house and plumbing and electrical work for a backup generator.
Is a backup generator being installed at 723 Skillman St?
A City of Dallas electrical permit describes a backup generator, and a plumbing permit dated September 16, 2026, describes a gas test for a generator.
Is the sewer line being replaced at 723 Skillman St?
A residential plumbing permit describes a sewer re-pipe from the yard to the house. It was filed March 9, 2026, under permit RES-PLM-26-002564.
When were the permits filed for work at 723 Skillman St?
The sewer re-pipe permit was filed March 9, 2026. The generator-related plumbing and electrical permits were filed September 16, 2026.
How much will the work at 723 Skillman St cost?
The available City of Dallas permit records do not report a project cost or valuation.
Also being built nearby
All of 75214- 727 Skillman StAug 5, 2025Remove old hvac and replace with new 4ton hvac system · 4 m away
- 715 Skillman StApr 15, 2026Will breakout and remove front concrete porch, saw cutting about 8" inches away from decorative concrete in front and sides. will raise to reasonably level, left concrete steps and front concrete steps then side porch steps, using 7 concrete piers. will repour the front porch at least 4"inches thick, with 1/2" inch rebar. will dowel into all adjacent concrete. will pour a medium slump. will slope new concrete at 1" inch front back to front. will pack area under old porch with compacted soil · 7 m away
- 711 Skillman StApr 14, 2026Install 14 double concrete pilings under front wall and all of the right wall, raise to reasonably level position all interior walls. install scuttlehole box at the wall for crawlspace access. breakout and remove front concrete porch. repour front porch minimum 4" thick, with 1/2" rebar. will dowel into adjacent concrete.will raise to reasonably level, left concrete steps and front concrete steps, side porch steps if necessary using 7 concrete block piers.will leave premises clean and orderly, job to be completed 7 days from start · 11 m away
- 710 Skillman StOct 15, 2020Replace or modify existing hvac · 17 m away
- 811 Skillman StJun 2, 2026Tunnel replacement of part of main sewer underneath building. about 100 feet · 82 m away
- 724 Lowell StJul 23, 2026Reroof iko dynasty 30 year warranty · 93 m away
- 702 Lowell StSep 28, 2020Sewer relay · 94 m away
- 725 Lowell StMay 8, 2026Fix ductwork and vent out 3 bath fans · 106 m away
- 705 Lowell StSep 18, 2026X install 11 total pilings (9 exterior, 2 via crawlspace).x reset/re-shim 2,300 sq ft of the foundation · 106 m away
- 725 Ridgeway StApr 17, 20262.5 ton split gas system no ductwork · 109 m away
- 713 Ridgeway StOct 20, 2025Replace existing ac system · 110 m away
- 5920 Junius StOct 16, 2025Replace weatherhead- oncor disconnected the line and we need a meter release - occupied home · 134 m away