Sewer tunnel replacement permitted at 811 Skillman St
A commercial plumbing permit indicates about 100 feet of the main sewer underneath the building will be replaced. The City of Dallas permit was filed June 2, 2026.
Summarized from City of Dallas records · updated Jun 2, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 2, 2026
- since Jun 2, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 811 Skillman St
What is being built at 811 Skillman St?
A City of Dallas commercial plumbing permit describes replacement of part of the main sewer underneath the building, about 100 feet long. It does not describe a new building.
What sewer work is planned at 811 Skillman St?
The permit describes tunnel replacement of part of the main sewer underneath the building.
When was the sewer permit filed for 811 Skillman St?
The City of Dallas filed the permit on June 2, 2026.
How long is the sewer section being replaced at 811 Skillman St?
The permit description says the sewer tunnel replacement covers about 100 feet.
What is the permit number for work at 811 Skillman St?
The permit number is COM-PLM-26-001778. It is listed as a commercial plumbing permit filed June 2, 2026.
Is a new building planned at 811 Skillman St?
The available City of Dallas record describes sewer tunnel replacement underneath the building, not new building construction.
Also being built nearby
All of 75214- 727 Skillman StAug 5, 2025Remove old hvac and replace with new 4ton hvac system · 78 m away
- 723 Skillman StSep 16, 2026Back up generator · 82 m away
- 715 Skillman StApr 15, 2026Will breakout and remove front concrete porch, saw cutting about 8" inches away from decorative concrete in front and sides. will raise to reasonably level, left concrete steps and front concrete steps then side porch steps, using 7 concrete piers. will repour the front porch at least 4"inches thick, with 1/2" inch rebar. will dowel into all adjacent concrete. will pour a medium slump. will slope new concrete at 1" inch front back to front. will pack area under old porch with compacted soil · 90 m away
- 711 Skillman StApr 14, 2026Install 14 double concrete pilings under front wall and all of the right wall, raise to reasonably level position all interior walls. install scuttlehole box at the wall for crawlspace access. breakout and remove front concrete porch. repour front porch minimum 4" thick, with 1/2" rebar. will dowel into adjacent concrete.will raise to reasonably level, left concrete steps and front concrete steps, side porch steps if necessary using 7 concrete block piers.will leave premises clean and orderly, job to be completed 7 days from start · 93 m away
- 710 Skillman StOct 15, 2020Replace or modify existing hvac · 94 m away
- 724 Lowell StJul 23, 2026Reroof iko dynasty 30 year warranty · 120 m away
- 725 Lowell StMay 8, 2026Fix ductwork and vent out 3 bath fans · 130 m away
- 702 Lowell StSep 28, 2020Sewer relay · 134 m away
- 725 Ridgeway StApr 17, 20262.5 ton split gas system no ductwork · 136 m away
- 705 Lowell StSep 18, 2026X install 11 total pilings (9 exterior, 2 via crawlspace).x reset/re-shim 2,300 sq ft of the foundation · 142 m away
- 713 Ridgeway StOct 20, 2025Replace existing ac system · 143 m away
- 5917 Gaston AveAug 13, 2025Rewire all the 4 units, 101, 102, 201 and 202, upgrade the electrical panels in all 4 units · 160 m away