Plumbing and electrical upgrades permitted for four units
Permits indicate plumbing and electrical upgrades in four existing units at 5917 Gaston Ave. The City of Dallas issued related permits from May 18 through August 13, 2025, covering new water and sewer lines, bathroom plumbing remodels, rewiring and electrical panel upgrades.
Summarized from City of Dallas records · updated Aug 13, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Aug 13, 2025
- since Oct 5, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsInstall all new sanitary sewer and water lines throughout the building.install all new fixtures
Install all new sanitary sewer and water lines throughout the building.install all new fixtures
City of Dallas permitCommercial Plumbing Permit
Sources: City of Dallas
Questions about 5917 Gaston Ave
What work is permitted at 5917 Gaston Ave in Dallas?
City of Dallas permits cover plumbing and electrical work in units 101, 102, 201 and 202, including new water and sewer lines, bathroom plumbing remodels, rewiring and panel upgrades.
When were the permits issued for 5917 Gaston Ave?
The four listed permits were filed between May 18 and August 13, 2025.
Are the units at 5917 Gaston Ave getting electrical upgrades?
Yes. Permit COM-ELC-25-001367, filed August 13, 2025, covers rewiring all four units and upgrading their electrical panels. An earlier electrical permit, COM-ELC-25-000451, was filed June 11, 2025.
What plumbing work is planned at 5917 Gaston Ave?
The permits describe new sanitary sewer and water lines and new fixtures throughout the building, plus bathroom plumbing remodels in units 101, 102, 201 and 202.
Is a new building being constructed at 5917 Gaston Ave?
The listed permits describe plumbing and electrical work in an existing building; they do not indicate new construction.
Also being built nearby
All of 75214- 811 Skillman StJun 2, 2026Tunnel replacement of part of main sewer underneath building. about 100 feet · 160 m away
- 1031 Skillman St · Dines PropertiesMay 30, 2025Lakewood orthodontics — renovation/alteration — renovation of an existing interior space · 168 m away
- 5908 Swiss AveNov 5, 2026Install new sewer piping , water lines and new gas lines · 170 m away
- 5928 Swiss AveJul 3, 2025Replace 2 leaking gas risers · 176 m away
- 725 Ridgeway StApr 17, 20262.5 ton split gas system no ductwork · 178 m away
- 713 Ridgeway StOct 20, 2025Replace existing ac system · 190 m away
- 5816 Swiss AveNov 2, 2026Hvac system change-out · 192 m away
- 731 N Glasgow DrMay 27, 2026Nsfaa second story addition. inside of the current layout, not changing the exterior · 193 m away
- 730 N Glasgow DrSep 29, 2020Remove existing roof and install new roof · 199 m away
- 5907 Swiss AveOct 16, 2025Tear off existing roof system down to decking, inspect decking, install like quality material in similar color. pick up debris, perform nail sweep · 201 m away
- 715 N Glasgow DrNov 16, 2026Replace hvac system with 4 ton lennox 17 seer 2 stage horizontal gas full system; no duct work · 207 m away
- 716 N Glasgow DrNov 9, 2026Will raise to a reasonably level position:all the left wall.will raise to the extent the structure will allow.will install 8 double concrete pilings under the area described above, each driven to a substantial point of refusal.will install one scuttlehole box for crawlspace access from the perimeter. will screw in old closet trap door cover and seal the edges.will raise to a reasonably level position:all the interior walls, shimming on the existing piers with hardwood shims. leveling subject to warps and bows of lumber.will pour 8 poured in place concrete footings under the center of the structure, using solid block pier caps and hardwood shims.will safely secure any electric wires on the ground to the floor joists.will remove rocks from all the left side of the structure, and from 2 feet away from the right side of the structure.will install clay soil against the concrete perimeter beam to create a positive slope away from the foundation.will raise the ac unit as necessary as not to place soil against it.will raise sprinkler heads as necessary. will remove some deck boards for soil installation, and return the boards on completion.will install a waterproofing membrane against 3 couses of brick of all the back wall, and the back 10 feet of the left wall, and the back 10 feet of the right wall. will place clay soil against the waterproofing to create a positive slope away from the foundation. will install mulch over the fresh soil as needed · 211 m away