731 N Glasgow Dr
Dallas, TX 75214
Permit filed for a second-story addition at 731 N Glasgow Dr
A City of Dallas permit describes a second-story residential addition at 731 N Glasgow Dr. The permit was filed May 27, 2026, and says the work is within the current layout with no exterior changes.
Summarized from City of Dallas records · updated May 27, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 27, 2026
- since May 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 731 N Glasgow Dr
What is being built at 731 N Glasgow Dr in Dallas?
A City of Dallas permit describes a second-story residential addition within the current layout. It says the exterior will not change.
When was the permit filed for 731 N Glasgow Dr?
The permit was filed May 27, 2026.
What is the permit number for work at 731 N Glasgow Dr?
The permit number is RES-ALT-ADD-26-001010. It is listed as a Residential Alteration Addition Permit.
Will the work at 731 N Glasgow Dr change the exterior?
The permit description says the second-story addition is within the current layout and will not change the exterior.
Is 731 N Glasgow Dr a residential project?
Yes. The City of Dallas record classifies the project as a residential alteration and addition.
Also being built nearby
All of 75214- 730 N Glasgow DrSep 29, 2020Remove existing roof and install new roof · 13 m away
- 715 N Glasgow DrNov 16, 2026Replace hvac system with 4 ton lennox 17 seer 2 stage horizontal gas full system; no duct work · 15 m away
- 716 N Glasgow DrNov 9, 2026Will raise to a reasonably level position:all the left wall.will raise to the extent the structure will allow.will install 8 double concrete pilings under the area described above, each driven to a substantial point of refusal.will install one scuttlehole box for crawlspace access from the perimeter. will screw in old closet trap door cover and seal the edges.will raise to a reasonably level position:all the interior walls, shimming on the existing piers with hardwood shims. leveling subject to warps and bows of lumber.will pour 8 poured in place concrete footings under the center of the structure, using solid block pier caps and hardwood shims.will safely secure any electric wires on the ground to the floor joists.will remove rocks from all the left side of the structure, and from 2 feet away from the right side of the structure.will install clay soil against the concrete perimeter beam to create a positive slope away from the foundation.will raise the ac unit as necessary as not to place soil against it.will raise sprinkler heads as necessary. will remove some deck boards for soil installation, and return the boards on completion.will install a waterproofing membrane against 3 couses of brick of all the back wall, and the back 10 feet of the left wall, and the back 10 feet of the right wall. will place clay soil against the waterproofing to create a positive slope away from the foundation. will install mulch over the fresh soil as needed · 18 m away
- 712 N Glasgow DrMay 29, 2026Replace 4 ton gas ac · 21 m away
- 703 N Glasgow DrJun 2, 2025Replacing a 4 ton heat pump complete system · 27 m away
- 702 N Glasgow DrJun 16, 2025Installation of new mini split, 24k btu wall mounted unit · 30 m away
- 6000 Junius StMay 20, 2026Install 40 gallon gas water heater in attic (swap out) · 48 m away
- 6008 Junius StOct 19, 202650 gallon gas american water heater in laundry room closet · 65 m away
- 5930 Junius StJul 8, 2025Reroof with gaf hdz · 84 m away
- 5926 Junius StOct 15, 2026Install 40 gallon gas water heater in garage closet (swap out) · 88 m away
- 5920 Junius StOct 16, 2025Replace weatherhead- oncor disconnected the line and we need a meter release - occupied home · 94 m away
- 6022 Junius StJul 24, 2026Reroof · 103 m away