712 N Glasgow Dr
Dallas, TX 75214
Permits cover two 4-ton gas HVAC replacements
City of Dallas permits filed May 29, 2026, indicate replacement of two 4-ton gas air-conditioning units at this residence. The records do not list a project valuation or square footage.
Summarized from City of Dallas records · updated May 29, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 29, 2026
- since May 29, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 712 N Glasgow Dr
What is happening at 712 N Glasgow Dr?
Two City of Dallas residential mechanical permits indicate that 4-ton gas air-conditioning equipment is being replaced. Both permits were filed May 29, 2026.
Is a new home being built at 712 N Glasgow Dr?
The records provided list two residential mechanical permits for equipment replacement, not a new-home project. Both were filed May 29, 2026.
What do the permits at 712 N Glasgow Dr cover?
Permit RES-MEC-26-002603 describes replacement of a 4-ton gas unit, and permit RES-MEC-26-002602 describes replacement of a 4-ton gas AC. Both are dated May 29, 2026.
When were the permits filed for 712 N Glasgow Dr?
The two City of Dallas residential mechanical permits were filed on May 29, 2026.
How many permits are listed for 712 N Glasgow Dr?
Two City of Dallas permits are listed, both for 4-ton gas air-conditioning equipment replacement and both filed May 29, 2026.
Also being built nearby
All of 75214- 716 N Glasgow DrNov 9, 2026Will raise to a reasonably level position:all the left wall.will raise to the extent the structure will allow.will install 8 double concrete pilings under the area described above, each driven to a substantial point of refusal.will install one scuttlehole box for crawlspace access from the perimeter. will screw in old closet trap door cover and seal the edges.will raise to a reasonably level position:all the interior walls, shimming on the existing piers with hardwood shims. leveling subject to warps and bows of lumber.will pour 8 poured in place concrete footings under the center of the structure, using solid block pier caps and hardwood shims.will safely secure any electric wires on the ground to the floor joists.will remove rocks from all the left side of the structure, and from 2 feet away from the right side of the structure.will install clay soil against the concrete perimeter beam to create a positive slope away from the foundation.will raise the ac unit as necessary as not to place soil against it.will raise sprinkler heads as necessary. will remove some deck boards for soil installation, and return the boards on completion.will install a waterproofing membrane against 3 couses of brick of all the back wall, and the back 10 feet of the left wall, and the back 10 feet of the right wall. will place clay soil against the waterproofing to create a positive slope away from the foundation. will install mulch over the fresh soil as needed · 4 m away
- 702 N Glasgow DrJun 16, 2025Installation of new mini split, 24k btu wall mounted unit · 10 m away
- 715 N Glasgow DrNov 16, 2026Replace hvac system with 4 ton lennox 17 seer 2 stage horizontal gas full system; no duct work · 13 m away
- 703 N Glasgow DrJun 2, 2025Replacing a 4 ton heat pump complete system · 16 m away
- 730 N Glasgow DrSep 29, 2020Remove existing roof and install new roof · 17 m away
- 731 N Glasgow DrMay 27, 2026Nsfaa second story addition. inside of the current layout, not changing the exterior · 21 m away
- 6000 Junius StMay 20, 2026Install 40 gallon gas water heater in attic (swap out) · 27 m away
- 6008 Junius StOct 19, 202650 gallon gas american water heater in laundry room closet · 44 m away
- 6022 Junius StJul 24, 2026Reroof · 85 m away
- 5930 Junius StJul 8, 2025Reroof with gaf hdz · 90 m away
- 715 Lipscomb AveDec 21, 2020Gas test · 93 m away
- 717 Lipscomb AveAug 25, 2025Replacing one 3 ton system · 93 m away