702 N Glasgow Dr
Dallas, TX 75214
702 N Glasgow Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 702 N Glasgow Dr, Dallas, TX 75214. The most recent, filed June 16, 2025, covers: “Installation of new mini split, 24k btu wall mounted unit”.
Compiled from City of Dallas records · updated Jun 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 16, 2025
- since Jun 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 702 N Glasgow Dr
What is being built at 702 N Glasgow Dr?
The latest filing (City of Dallas permit RES-MEC-25-000756, June 16, 2025) covers installation of new mini split, 24k btu wall mounted unit.
How many permits and filings does 702 N Glasgow Dr have?
1 filing across 1 project, from June 16, 2025 to June 16, 2025.
Is there other construction near 702 N Glasgow Dr?
Yes. Nearby filings include 712 N Glasgow Dr (replace 4 ton gas ac, May 29, 2026); 703 N Glasgow Dr (replacing a 4 ton heat pump complete system, Jun 2, 2025); 716 N Glasgow Dr (will raise to a reasonably level position:all the left wall.will raise to the extent the structure will allow.will install 8 double concrete pilings under the area described above, each driven to a substantial point of refusal.will install one scuttlehole box for crawlspace access from the perimeter. will screw in old closet trap door cover and seal the edges.will raise to a reasonably level position:all the interior walls, shimming on the existing piers with hardwood shims. leveling subject to warps and bows of lumber.will pour 8 poured in place concrete footings under the center of the structure, using solid block pier caps and hardwood shims.will safely secure any electric wires on the ground to the floor joists.will remove rocks from all the left side of the structure, and from 2 feet away from the right side of the structure.will install clay soil against the concrete perimeter beam to create a positive slope away from the foundation.will raise the ac unit as necessary as not to place soil against it.will raise sprinkler heads as necessary. will remove some deck boards for soil installation, and return the boards on completion.will install a waterproofing membrane against 3 couses of brick of all the back wall, and the back 10 feet of the left wall, and the back 10 feet of the right wall. will place clay soil against the waterproofing to create a positive slope away from the foundation. will install mulch over the fresh soil as needed, Nov 9, 2026).
How do I get alerts for new permits at 702 N Glasgow Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 712 N Glasgow DrMay 29, 2026Replace 4 ton gas ac · 10 m away
- 703 N Glasgow DrJun 2, 2025Replacing a 4 ton heat pump complete system · 13 m away
- 716 N Glasgow DrNov 9, 2026Will raise to a reasonably level position:all the left wall.will raise to the extent the structure will allow.will install 8 double concrete pilings under the area described above, each driven to a substantial point of refusal.will install one scuttlehole box for crawlspace access from the perimeter. will screw in old closet trap door cover and seal the edges.will raise to a reasonably level position:all the interior walls, shimming on the existing piers with hardwood shims. leveling subject to warps and bows of lumber.will pour 8 poured in place concrete footings under the center of the structure, using solid block pier caps and hardwood shims.will safely secure any electric wires on the ground to the floor joists.will remove rocks from all the left side of the structure, and from 2 feet away from the right side of the structure.will install clay soil against the concrete perimeter beam to create a positive slope away from the foundation.will raise the ac unit as necessary as not to place soil against it.will raise sprinkler heads as necessary. will remove some deck boards for soil installation, and return the boards on completion.will install a waterproofing membrane against 3 couses of brick of all the back wall, and the back 10 feet of the left wall, and the back 10 feet of the right wall. will place clay soil against the waterproofing to create a positive slope away from the foundation. will install mulch over the fresh soil as needed · 13 m away
- 715 N Glasgow DrNov 16, 2026Replace hvac system with 4 ton lennox 17 seer 2 stage horizontal gas full system; no duct work · 17 m away
- 6000 Junius StMay 20, 2026Install 40 gallon gas water heater in attic (swap out) · 18 m away
- 730 N Glasgow DrSep 29, 2020Remove existing roof and install new roof · 27 m away
- 731 N Glasgow DrMay 27, 2026Nsfaa second story addition. inside of the current layout, not changing the exterior · 30 m away
- 6008 Junius StOct 19, 202650 gallon gas american water heater in laundry room closet · 39 m away
- 6022 Junius StJul 24, 2026Reroof · 82 m away
- 5930 Junius StJul 8, 2025Reroof with gaf hdz · 88 m away
- 5926 Junius StOct 15, 2026Install 40 gallon gas water heater in garage closet (swap out) · 92 m away
- 715 Lipscomb AveDec 21, 2020Gas test · 94 m away