730 N Glasgow Dr
Dallas, TX 75214
730 N Glasgow Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 730 N Glasgow Dr, Dallas, TX 75214. The most recent, filed September 29, 2020, covers: “Remove existing roof and install new roof”.
Compiled from City of Dallas records · updated Sep 29, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2020
- since Sep 29, 2020
- Largest scope
- —
- Listed value
- $8
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 730 N Glasgow Dr
What is being built at 730 N Glasgow Dr?
The latest filing (City of Dallas permit 2009296023, September 29, 2020) covers remove existing roof and install new roof.
How many permits and filings does 730 N Glasgow Dr have?
1 filing across 1 project, from September 29, 2020 to September 29, 2020.
How much is the construction at 730 N Glasgow Dr worth?
Permits at this address list about $8 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 730 N Glasgow Dr?
Yes. Nearby filings include 731 N Glasgow Dr (nsfaa second story addition. inside of the current layout, not changing the exterior, May 27, 2026); 716 N Glasgow Dr (will raise to a reasonably level position:all the left wall.will raise to the extent the structure will allow.will install 8 double concrete pilings under the area described above, each driven to a substantial point of refusal.will install one scuttlehole box for crawlspace access from the perimeter. will screw in old closet trap door cover and seal the edges.will raise to a reasonably level position:all the interior walls, shimming on the existing piers with hardwood shims. leveling subject to warps and bows of lumber.will pour 8 poured in place concrete footings under the center of the structure, using solid block pier caps and hardwood shims.will safely secure any electric wires on the ground to the floor joists.will remove rocks from all the left side of the structure, and from 2 feet away from the right side of the structure.will install clay soil against the concrete perimeter beam to create a positive slope away from the foundation.will raise the ac unit as necessary as not to place soil against it.will raise sprinkler heads as necessary. will remove some deck boards for soil installation, and return the boards on completion.will install a waterproofing membrane against 3 couses of brick of all the back wall, and the back 10 feet of the left wall, and the back 10 feet of the right wall. will place clay soil against the waterproofing to create a positive slope away from the foundation. will install mulch over the fresh soil as needed, Nov 9, 2026); 712 N Glasgow Dr (replace 4 ton gas ac, May 29, 2026).
How do I get alerts for new permits at 730 N Glasgow Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75214- 731 N Glasgow DrMay 27, 2026Nsfaa second story addition. inside of the current layout, not changing the exterior · 13 m away
- 716 N Glasgow DrNov 9, 2026Will raise to a reasonably level position:all the left wall.will raise to the extent the structure will allow.will install 8 double concrete pilings under the area described above, each driven to a substantial point of refusal.will install one scuttlehole box for crawlspace access from the perimeter. will screw in old closet trap door cover and seal the edges.will raise to a reasonably level position:all the interior walls, shimming on the existing piers with hardwood shims. leveling subject to warps and bows of lumber.will pour 8 poured in place concrete footings under the center of the structure, using solid block pier caps and hardwood shims.will safely secure any electric wires on the ground to the floor joists.will remove rocks from all the left side of the structure, and from 2 feet away from the right side of the structure.will install clay soil against the concrete perimeter beam to create a positive slope away from the foundation.will raise the ac unit as necessary as not to place soil against it.will raise sprinkler heads as necessary. will remove some deck boards for soil installation, and return the boards on completion.will install a waterproofing membrane against 3 couses of brick of all the back wall, and the back 10 feet of the left wall, and the back 10 feet of the right wall. will place clay soil against the waterproofing to create a positive slope away from the foundation. will install mulch over the fresh soil as needed · 13 m away
- 712 N Glasgow DrMay 29, 2026Replace 4 ton gas ac · 17 m away
- 715 N Glasgow DrNov 16, 2026Replace hvac system with 4 ton lennox 17 seer 2 stage horizontal gas full system; no duct work · 20 m away
- 702 N Glasgow DrJun 16, 2025Installation of new mini split, 24k btu wall mounted unit · 27 m away
- 703 N Glasgow DrJun 2, 2025Replacing a 4 ton heat pump complete system · 29 m away
- 6000 Junius StMay 20, 2026Install 40 gallon gas water heater in attic (swap out) · 43 m away
- 6008 Junius StOct 19, 202650 gallon gas american water heater in laundry room closet · 56 m away
- 6022 Junius StJul 24, 2026Reroof · 91 m away
- 721 Lipscomb AveNov 25, 2020Gas relay or repair with test · 94 m away
- 717 Lipscomb AveAug 25, 2025Replacing one 3 ton system · 95 m away
- 715 Lipscomb AveDec 21, 2020Gas test · 95 m away