7411 Coronado Ave
Dallas, TX 75214
Permits to complete work under an earlier construction permit
Two Dallas permits at 7411 Coronado Ave indicate work to complete work covered by original permit 2103231024. A commercial new construction permit was filed March 2, 2026, followed by a commercial electrical permit on March 10, 2026. The records do not describe the project’s use or scope beyond completing the earlier work.
Summarized from City of Dallas records · updated Mar 10, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Mar 10, 2026
- since Mar 2, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 7411 Coronado Ave
What is being built at 7411 Coronado Ave in Dallas?
Dallas permits indicate work is being completed under original permit 2103231024. The records do not identify the building’s use or provide further project details.
What do the permits at 7411 Coronado Ave cover?
The records include a commercial new construction permit and a commercial electrical permit, both described as completing work from original permit 2103231024.
When were permits filed for 7411 Coronado Ave?
The commercial new construction permit, COM-NEW-26-000019, was filed March 2, 2026. The electrical permit, COM-ELC-26-001053, was filed March 10, 2026.
Is new construction planned at 7411 Coronado Ave?
A commercial new construction permit was filed March 2, 2026, but its description says it is to complete work from original permit 2103231024. The record does not specify the project’s scope.
What is the electrical work at 7411 Coronado Ave?
The City of Dallas issued a commercial electrical permit, COM-ELC-26-001053, on March 10, 2026. Its description says the work is to complete work from original permit 2103231024.
Also being built nearby
All of 75214- 7414 East Grand AveMar 26, 2026Wire carports for lighting · 46 m away
- 7416 Coronado AveJul 15, 2025Redo shower--replace plumbing fixtures in master bath only · 48 m away
- 7450 Coronado AveJan 8, 2021Install lawn sprinkler · 117 m away
- 7420 La Vista Drive · Dallas Independant School DistrictOct 30, 2024Eduardo mata montessori — renovation/alteration — the project consists of: repairing the water leaks at the penthouses by rebuilding the penthouse walls, replacing louvers, damaged ceiling tiles, and light fixtures. hvac and plumbing improvements including: replacing split systems in data rooms; rep · 144 m away
- 7420 La Vista DrNov 10, 2025Plumbing teachers lounge1 sink1 lavatory1 water closet1 6 gallon water heater · 144 m away
- 7339 La Vista DrSep 8, 2025Electrical work for swimming pool · 166 m away
- 7338 Coronado AveMay 6, 2026Verify utilty disconnects ( water, gas, electric)mechanically demolish te primary structure and any specified outbuildingsbreak and remove concrete slabs, footings and driveway haul all debris to a tceq-authorized landfillrough grade the lot to a walkabel conditionasbestos abatement through a third party subcontractor with texas licensegc acts only as coordinator for asbestos inspector. any liability regarding fibres, air quality, or disposal remains with the licensed abatement contractorper dallad city code article x, gc will install orange fencing around protected trees. stormborn construction is responsible for identifying all "heritage" or "protected" trees on the survey. gc is not responsible for the removal of undisclosed deptic tanks, swimming pools, or underground storage tanks unless specifically listed in scope of worksidewalk/curbs gc will use "tracking pads" to protect city property, but is not liable for existing cracks or failures in aged city infrastructuregc will maintain a safe job site are per osha standardsgc is liable only for damage to property owners assets caused by gross negligence. gc is not liable for "vibration damage " to neighbors structures if work is performed within standard industry limits · 175 m away
- 7530 East Grand AveNov 17, 2025Plumbing work · 177 m away
- 7532 East Grand AveNov 19, 2025Demolition as shown on plans. provide and install 2 new trane rtu's, curbs and accessories per plans. provide and install new ductwork, grills, low voltage wiring, thermostats/sensors and drains. install customer provided make up air unit. full captive air package to be provided by customer and installed by others. includes crane and permitting. any final drain termination connections to be completed by plumber. all line volteage to be completed by electrician.all work to be completed according to plans and within state and local codes · 181 m away
- 7532 E. Grand Ave · Mcref IV Trailhead Apartment Owner LPSep 19, 2025Beans and brews — new construction — 1,100 sqf · 181 m away
- 7331 Coronado AveSep 28, 2026Install water heater · 189 m away
- 7440 La Vista DrAug 24, 2026Apt.334- changeout existing system. install 1.5. ton split system · 191 m away