7440 La Vista Dr
Dallas, TX 75214
Two permits cover a 1.5-ton HVAC system replacement
Two City of Dallas permits filed in August 2026 cover changing out the existing system for Apartment 334 at 7440 La Vista Dr and installing a 1.5-ton split system. The permits were filed on August 6 (COM-MEC-26-001960) and August 24 (COM-MEC-26-002029).
Summarized from City of Dallas records · updated Aug 24, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 24, 2026
- since Aug 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 7440 La Vista Dr
What is being built at 7440 La Vista Dr?
The permits describe replacement of the existing system in Apartment 334 and installation of a 1.5-ton split system. They do not describe a new building.
Is a new HVAC system being installed at 7440 La Vista Dr?
Yes. City of Dallas permit descriptions say the existing system in Apartment 334 is being changed out for a 1.5-ton split system.
When were the permits filed for 7440 La Vista Dr?
The two permits were filed August 6 and August 24, 2026.
What are the permit numbers for 7440 La Vista Dr?
The City of Dallas permits are COM-MEC-26-001960, filed August 6, 2026, and COM-MEC-26-002029, filed August 24, 2026.
Which apartment is listed on the permits at 7440 La Vista Dr?
Both permit descriptions identify Apartment 334.
Also being built nearby
All of 75214- 7420 La Vista DrNov 10, 2025Plumbing teachers lounge1 sink1 lavatory1 water closet1 6 gallon water heater · 68 m away
- 7420 La Vista Drive · Dallas Independant School DistrictOct 30, 2024Eduardo mata montessori — renovation/alteration — the project consists of: repairing the water leaks at the penthouses by rebuilding the penthouse walls, replacing louvers, damaged ceiling tiles, and light fixtures. hvac and plumbing improvements including: replacing split systems in data rooms; rep · 68 m away
- 7450 Coronado AveJan 8, 2021Install lawn sprinkler · 112 m away
- 7416 Coronado AveJul 15, 2025Redo shower--replace plumbing fixtures in master bath only · 154 m away
- 7411 Coronado AveMar 10, 2026To complete work from original permit 2103231024 · 191 m away
- 7414 East Grand AveMar 26, 2026Wire carports for lighting · 236 m away
- 7339 La Vista DrSep 8, 2025Electrical work for swimming pool · 284 m away
- 7150 East Grand AveAug 18, 2026Replace fixtures · 305 m away
- 7159 East Grand AveOct 6, 2025Dsst-pvt spanish world school adding 275 ft of iron fence to current parking lot 6ft tall with 1 double open gate 26 ft · 344 m away
- 7338 Coronado AveMay 6, 2026Verify utilty disconnects ( water, gas, electric)mechanically demolish te primary structure and any specified outbuildingsbreak and remove concrete slabs, footings and driveway haul all debris to a tceq-authorized landfillrough grade the lot to a walkabel conditionasbestos abatement through a third party subcontractor with texas licensegc acts only as coordinator for asbestos inspector. any liability regarding fibres, air quality, or disposal remains with the licensed abatement contractorper dallad city code article x, gc will install orange fencing around protected trees. stormborn construction is responsible for identifying all "heritage" or "protected" trees on the survey. gc is not responsible for the removal of undisclosed deptic tanks, swimming pools, or underground storage tanks unless specifically listed in scope of worksidewalk/curbs gc will use "tracking pads" to protect city property, but is not liable for existing cracks or failures in aged city infrastructuregc will maintain a safe job site are per osha standardsgc is liable only for damage to property owners assets caused by gross negligence. gc is not liable for "vibration damage " to neighbors structures if work is performed within standard industry limits · 344 m away
- 7530 East Grand AveNov 17, 2025Plumbing work · 351 m away
- 7532 E. Grand Ave · Mcref IV Trailhead Apartment Owner LPSep 19, 2025Beans and brews — new construction — 1,100 sqf · 354 m away