1901 Peabody Ave
Dallas, TX 75215
Seven pole lights permitted at 1901 Peabody Ave
A City of Dallas commercial electrical permit indicates that seven pole lights are being installed at 1901 Peabody Ave. The permit was filed August 10, 2026; the record does not specify a broader construction project.
Summarized from City of Dallas records · updated Aug 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 10, 2026
- since Aug 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1901 Peabody Ave
What is being built at 1901 Peabody Ave?
A City of Dallas permit records the installation of seven pole lights. It does not identify a new building or broader project.
What work was permitted at 1901 Peabody Ave?
Commercial electrical work to install seven pole lights was permitted under record COM-ELC-26-003769.
When was the permit filed for 1901 Peabody Ave?
The permit was filed on August 10, 2026.
How many pole lights are being installed at 1901 Peabody Ave?
The permit description says seven pole lights.
What work is happening near Starbucks on Martin Luther King Jr Blvd?
A permit at 1901 Peabody Ave, about 118 meters from Starbucks at 1920 Martin Luther King Jr Blvd, records installation of seven pole lights. It was filed August 10, 2026.
Also being built nearby
All of 75215- 3116 S Harwood StJan 7, 2021Demolition sfd · 30 m away
- 1904 Martin Luther King Jr BlvdOct 6, 2026This permit application is for the temporary installation of a stage, performance risers, and aluminum truss structures associated with the forest theater grand return special event.a temporary stage measuring 60 feet wide by 48 feet deep by 4 feet high will be installed within the roadway at the intersection of martin luther king jr. boulevard and s.m. wright freeway, as shown on the approved event site plan. the stage will include three (3) sets of 4-foot access stairs to provide performer access.the following performance risers will be installed on the stage:one (1) circular riser measuring 12 feet in diameter by 3 feet hightwo (2) risers measuring 12 feet x 8 feet x 2 feet highone (1) riser measuring 12 feet x 8 feet x 3 feet highone (1) riser measuring 12 feet x 8 feet x 1 foot hightwo (2) risers measuring 8 feet x 8 feet x 1 foot hightemporary aluminum truss structures will be installed over the northeast crosswalk areas at the intersection of martin luther king jr. boulevard and s.m. wright freeway. each truss structure will measure approximately 40 feet wide by 20 feet high and will be constructed from multiple interconnected 20-foot aluminum truss sections. the truss structures will span the crosswalk areas and support temporary lighting, audio, drapery, and other event production equipment associated with the special event.all truss structures, suspended equipment, stage components, and associated temporary structures will be installed, secured, and maintained in accordance with the manufacturer's specifications and any required engineering documentation. installation and removal will be performed by qualified event production personnel, and all temporary structures will remain within the approved special event permit footprint · 71 m away
- 1920 Martin Luther King Jr Blvd · Forest Theater LLCJul 9, 2026Starbucks coffee — renovation/alteration — 1,653 sq ft tenant fit out · 118 m away
- 1920 Mlk Blvd · Forest Theater LLCFeb 28, 2025Forest theater — renovation/alteration — rehabilitation of the original cinema centric theater and conversion of theater to a music centric venue with a studio theater and community room addition · 118 m away
- 1918 Martin Luther King Jr BlvdJun 3, 2026Performed hvac installation, removal, and replacement of heating, ventilation, and air conditioning equipment, including furnaces, condensers, air handlers, heat pumps, and package units. installed, repaired, and modified ductwork, ventilation systems, registers, and exhaust systems. conducted equipment maintenance, troubleshooting, refrigerant line installation, thermostat setup, airflow balancing, and system testing to ensure proper operation and efficiency · 118 m away
- 1912 Martin Luther King Jr BlvdDec 14, 2020Renovation · 118 m away
- 1914 Pennsylvania AveJun 9, 2026Service upgrade · 131 m away
- 1819 Martin Luther King Jr BlvdDec 5, 2025Qteam paving lot for commercial parking lot associated with the forest forward project located across the street · 166 m away
- 2213 Pennsylvania AveOct 12, 2025Install a traffic signal service · 173 m away
- 2313 Peabody AveMay 1, 2026Install double check backflow device and 3 yard hydrants for garden watering · 183 m away
- 2317 Peabody AveDec 17, 2025Gas pressure check · 186 m away
- 3302 S Harwood StApr 21, 2026New construction · 212 m away