1920 Martin Luther King Jr Blvd
Dallas, TX 75215 · Forest Theater LLC
Starbucks Coffee fit-out planned at 1920 MLK Jr Blvd
A 1,653-square-foot Starbucks Coffee tenant fit-out is planned at 1920 Martin Luther King Jr Blvd in Dallas. A TDLR project registration dated July 9, 2026, describes a renovation and alteration; Dallas permits filed earlier in 2026 cover tenant finish-out, electrical, plumbing and HVAC work. The applicant's estimated project cost is $830,000.
Summarized from Texas Department of Licensing and Regulation, City of Dallas records · updated Jul 9, 2026
- Projects
- 20
- 20 filings
- Latest filing
- Jul 9, 2026
- since Jun 6, 2025
- Largest scope
- 1,653 sf
- Estimated cost
- $830K
- state registration
Where this project stands
Finishing up · inspection nextStarbucks Coffee
1,653 sq ft · $830K est.
- RegisteredJul 9, 2026
- Plan review
- ConstructionFeb '25 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 3, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 4 phone numbers
Permit & project history
20 projects1,653 sq ft tenant fit out. — forest theater
TDLR project registrationRenovation/AlterationReview Complete1,653 sq ft$830K est.- Project #
- TABS2026024888
- Tenant / owner
- Starbucks Coffee
- Design firm
- Pro
- Contact
- Pro
Install above floor water and vent systems along with installation of plumbing fixtures for coffee shop
Install above floor water and vent systems along with installation of plumbing fixtures for coffee shop
City of Dallas permitCommercial Plumbing PermitPerformed hvac installation, repair, and replacement of heating and cooling systems. installed and serviced furnaces, condensers, air handlers, heat pumps, ductwork, thermostats, and ventilation systems. conducted maintenance, troubleshooting, system testing, and airflow adjustments to ensure efficient and reliable operation
Performed hvac installation, repair, and replacement of heating and cooling systems. installed and serviced furnaces, condensers, air handlers, heat pumps, ductwork, thermostats, and ventilation systems. conducted maintenance, troubleshooting, system testing, and airflow adjustments to ensure efficient and reliable operation
City of Dallas permitCommercial Mechanical Permit
Sources: Texas Department of Licensing and Regulation · City of Dallas
Questions about 1920 Martin Luther King Jr Blvd
What is being built at 1920 Martin Luther King Jr Blvd?
Permits indicate a 1,653-square-foot Starbucks Coffee tenant fit-out. The TDLR registration, TABS2026024888, was filed July 9, 2026.
Is a Starbucks opening at 1920 Martin Luther King Jr Blvd in Dallas?
The records show a Starbucks Coffee tenant fit-out and related construction permits. They do not give an opening date.
How large is the Starbucks fit-out at 1920 Martin Luther King Jr Blvd?
The TDLR registration lists 1,653 square feet. A Dallas alteration permit filed March 25, 2026, describes a 1,652-square-foot tenant finish-out.
When was the Starbucks project at 1920 Martin Luther King Jr Blvd permitted?
The latest listed filing is the TDLR registration dated July 9, 2026. Dallas permits for electrical, plumbing and HVAC work were filed earlier in 2026.
How much will the Starbucks project at 1920 Martin Luther King Jr Blvd cost?
The TDLR registration lists an applicant-estimated project cost of $830,000. This is an estimate, not a confirmed final cost.
What is being built near Genesis Women Thrift Store on Martin Luther King Jr Blvd?
Permits indicate a 1,653-square-foot Starbucks Coffee tenant fit-out at 1920 Martin Luther King Jr Blvd, about 268 meters from Genesis Women Thrift Store at 1632 Martin Luther King, Jr. Blvd.
Also being built nearby
All of 75215- 1920 Mlk Blvd · Forest Theater LLCFeb 28, 2025Forest theater — renovation/alteration — rehabilitation of the original cinema centric theater and conversion of theater to a music centric venue with a studio theater and community room addition
- 1918 Martin Luther King Jr BlvdJun 3, 2026Performed hvac installation, removal, and replacement of heating, ventilation, and air conditioning equipment, including furnaces, condensers, air handlers, heat pumps, and package units. installed, repaired, and modified ductwork, ventilation systems, registers, and exhaust systems. conducted equipment maintenance, troubleshooting, refrigerant line installation, thermostat setup, airflow balancing, and system testing to ensure proper operation and efficiency · 0 m away
- 1912 Martin Luther King Jr BlvdDec 14, 2020Renovation · 1 m away
- 1819 Martin Luther King Jr BlvdDec 5, 2025Qteam paving lot for commercial parking lot associated with the forest forward project located across the street · 80 m away
- 1904 Martin Luther King Jr BlvdOct 6, 2026This permit application is for the temporary installation of a stage, performance risers, and aluminum truss structures associated with the forest theater grand return special event.a temporary stage measuring 60 feet wide by 48 feet deep by 4 feet high will be installed within the roadway at the intersection of martin luther king jr. boulevard and s.m. wright freeway, as shown on the approved event site plan. the stage will include three (3) sets of 4-foot access stairs to provide performer access.the following performance risers will be installed on the stage:one (1) circular riser measuring 12 feet in diameter by 3 feet hightwo (2) risers measuring 12 feet x 8 feet x 2 feet highone (1) riser measuring 12 feet x 8 feet x 3 feet highone (1) riser measuring 12 feet x 8 feet x 1 foot hightwo (2) risers measuring 8 feet x 8 feet x 1 foot hightemporary aluminum truss structures will be installed over the northeast crosswalk areas at the intersection of martin luther king jr. boulevard and s.m. wright freeway. each truss structure will measure approximately 40 feet wide by 20 feet high and will be constructed from multiple interconnected 20-foot aluminum truss sections. the truss structures will span the crosswalk areas and support temporary lighting, audio, drapery, and other event production equipment associated with the special event.all truss structures, suspended equipment, stage components, and associated temporary structures will be installed, secured, and maintained in accordance with the manufacturer's specifications and any required engineering documentation. installation and removal will be performed by qualified event production personnel, and all temporary structures will remain within the approved special event permit footprint · 92 m away
- 1901 Peabody AveAug 10, 2026Installing electrical (7) pole lights · 118 m away
- 3116 S Harwood StJan 7, 2021Demolition sfd · 148 m away
- 1717 Martin Luther King Jr BlvdDec 30, 2025Tap out · 181 m away
- 1708 Martin Luther King Jr Blvd, Dallas, TX 75215 · Scottie Smith & AssociatesAug 7, 20241708 mlk — new construction — approximately 600 sq ft of existing building conversion to cafe and 3400 sq ft of new construction infill of two story office over restaurant · 188 m away
- 1708 Martin Luther King Jr BlvdFeb 25, 2026New construction plumbing of 3 tenant spaces. 1 a cafe', second one a smoking lounge, upstairs is office space · 188 m away
- 1709 Martin Luther King Jr BlvdNov 9, 2020Renovation for a new medical office · 189 m away
- 1706 Martin Luther King Jr BlvdOct 1, 2020Remove existing roof and install new roof · 190 m away