New restaurants in Dallas 75215
35 addresses in 75215 have permits or project filings for restaurants in the last two years. The most recent was filed at 6911 Bexar St.
Latest filings
- 6911 Bexar St · Citybuild Community Dev CorpNov 13, 2026Commercial remodel. adding plumbing for 1 hand sink, 1 three compartment sink, mop sink, mop sink faucet, one floor drain, 2 floor sinks and one small above ground grease trap
- 2807 Al Lipscomb Way · Southfair Community Development CorporationNov 12, 2026New 2 rooftop unit 5 ton total 10 ton, 2 new duct work, 1 exhaust fan rest room.new kitchen hood and makeup air
- 2915 Warren AveNov 5, 2026Complete rewire
- 3424 Kimble StNov 3, 2026Entire plumbing will be replaced, an extra bathroom will be added and island sink
- 3629 Colonial AveOct 29, 2026Interior tenant remodel in an existing building for a new bakery
- 3129 Mcdermott AveOct 21, 2026New hvac installation
- 2022 Botham Jean BlvdOct 7, 2026Temporary gas release
- 5000 S Malcolm X Blvd · Dallas ISDOct 6, 2026Lvl 2 cafe dsst disd ci east at historic lincoln high school
- 1516 Martin Luther King Jr BlvdSep 23, 2026Hvac
- 3309 Atlanta StSep 14, 2026Gas line installation from the gas meter into the house, serving the kitchen stove only
- 3740 Wendelkin StJul 29, 2026Repipe bath room and kitchen sewer relay
- 1519 Beaumont StJul 22, 2026Mcr interior remodel of kitchen, bedrooms, bathrooms of existing condominium. no new square footage will be added
- 3211 Spring AveJul 21, 2026Install 50 gallon gas water heater in kitchen cubby (swap out)
- 1920 Martin Luther King Jr Blvd · Forest Theater LLCJul 9, 2026Starbucks coffee — renovation/alteration — 1,653 sq ft tenant fit out
- 5115 Echo AveJul 8, 2026Instal new hvac system
- 3522 Wendelkin StJul 2, 2026Nsfaa-new accessory structure. it is a small, one bedroom studio with no kitchen. a new carport will also be added
- 3914 Spence StJun 22, 2026New construction
- 3830 Colonial AveJun 2, 2026New hvac installation
- 2601 South BlvdMay 27, 2026Gas test. gas service has been off
- 2234 Anderson StMay 1, 2026New a/c
- 3621 Meyers StApr 27, 2026Install 3 ton a/c system complete
- 2320 South BlvdApr 10, 2026Run gas lines to pool heater and grill
- 1708 Martin Luther King Jr BlvdFeb 25, 2026New construction plumbing of 3 tenant spaces. 1 a cafe', second one a smoking lounge, upstairs is office space
- 1621 Bannock AveFeb 19, 2026We will install a new hvac system
- 4622 Meadow StFeb 13, 2026Remodel plumbing in kitchen and bathroom
- 2703 Peabody AveFeb 9, 2026New construction electrical rough in and trim out
- 8687 N Central Expy · Northpark Land PartnersJan 26, 2026North park food court canopy suite 2388 — renovation/alteration — renovation of existing canopy for food court tenant
- 2822 Mcdermott AveJan 5, 2026Installation complete hvac system and air ducts
- 2705 Cleveland StDec 22, 2025The 2705 cleveland project is a multi-unit urban infill residential development designed to maximize efficiency on a narrow lot. the attached townhomes are organized in a row configuration with front-facing pedestrian entries and rear-alley-loaded garages, consistent with dallas infill design standards.each residence features an open-concept first floor, integrating living, kitchen, and dining spaces, while maintaining privacy for one downstairs bedroom. the second floor is dedicated to private living spaces, including a generous master suite, a flex office space, and an additional bedroom and bath. the design promotes modern urban living with efficient mechanical layouts, simple roof geometry, and clean elevations
- 2403 Romine AveDec 3, 2025Electrical remodel
- 1516 Mlk Jr. Blvd · Sp 1600 Penn FoundationNov 13, 2025The pot baked potato bar renovation — renovation/alteration — remodel and takeover of an existing building to accommodate a new dining establishment. project is approximately 2,038 sq ft
- 1660 Corinth StNov 10, 2025We will replace the main sewer lines throughout the building with pvc up to the garage. the garage and main line that runs to the street will be chain snaked and jetted since the line looks to be in good condition. the restrooms/kitchen in the main living quarters will have the sanitary line replaced due to back fall and a large belly in the line. there will be 4 accesses and approximately 370ft of tunnel under the building
- 2719 Starks AveOct 27, 2025New units
- 2904 S. Ervay Street · Cornerstone Community Development Corporation Inc.Oct 13, 2025Cornerstone baptist church restaurant — new construction — demolition of existing conditions, build new facility
- 2819 Twyman AveSep 29, 2025Complete home re-wire full home service panel upgrade rough in all switches, receptacles gfci, kitchen appliances (stove vent hood, dishwasher, garbage disposal, and fridge, washer, dryer, bathroom fans, ceiling, lights, vanity lights sconces, hvac system and water boiler. terminate all new wiring. trim out all fixtures
- 3735 S Malcolm X BlvdAug 12, 2025Replace sewer--water service--drains to washer box and kitchen sink
- 1708 Martin Luther King Jr Blvd, Dallas, TX 75215 · Scottie Smith & AssociatesAug 7, 20241708 mlk — new construction — approximately 600 sq ft of existing building conversion to cafe and 3400 sq ft of new construction infill of two story office over restaurant
Questions
What restaurants are being built in Dallas 75215?
35 addresses in 75215 have permits or project filings for restaurants in the last two years. The most recent was filed at 6911 Bexar St. Others include 2807 Al Lipscomb Way, 2915 Warren Ave, 3424 Kimble St.
How can I find out when a new restaurant is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new restaurant permit is filed.