New restaurants in Dallas 75223
27 addresses in 75223 have permits or project filings for restaurants in the last two years. The most recent was filed at 516 Grandview Ave.
Latest filings
- 516 Grandview AveOct 24, 2026Nsfaa
- 1001 Sarasota CirOct 20, 2026Pier and beam repair and 13 exterior piers
- 3219 Fairview AveOct 2, 2026New construction/new installation
- 1118 Valencia StAug 25, 2026Fence permit
- 7007 San Mateo BlvdAug 12, 2026Sewer drain line repair/replace
- 4811 Sapphire StAug 11, 2026New plumbing, two bathrooms, kitchen, laundry
- 4514 East Grand AveAug 3, 2026Kitchen drain reroute
- 1002 Cordova StAug 3, 2026Electrical service upgrade and kitchen rewire
- 915 Grandview AveJul 29, 2026Install new 1.5 2.0 and 4.0 ton electric systems and duct work
- 3602 Samuell Blvd · TX Tenison 2023, Ltd.Jul 16, 2026Floor 4 - 3c res
- 4858 East Grand AveJul 8, 2026Zo bc open existing wall to combine suites a and b for tres hermanas restaurant. interior remodel of approximately 200 sq ft existing use to remain unchanged
- 1027 Sarasota CirJul 7, 2026Nsfaa cedar and shingle pavilion and grill (propane)
- 519 Cordova StJun 16, 2026Repointing disassembly and reassembly of four separate pilars and balustrade between two of the pilars on the front porch. the two front porch pilars are 17x17 98 inches with a 30 x 144 x 8.5 inch balastrade connecting the pilars. and the two porto coche pilars are 21x21x98 inches.we have completed the pilars but await the repouring of the front porch to finish the connecting balustrade
- 523 Martinique AveJun 6, 2026Build new driveway with approach
- 1542 Caldwell AveMay 16, 2026Fence 8 foot high on right corner at my home
- 6822 Vivian AveMay 1, 2026Demolition and remove existing drive approach measuring ~10' x 12' with city sidewalk section. replace existing concrete with dimensions matching the existing
- 911 Valencia StApr 3, 2026Install new hvac system with ductwork
- 7014 Santa Monica DrMar 23, 2026Electrical for remodel
- 819 Clermont AveJan 16, 2026Install hvac
- 5430 East Grand AveDec 22, 2025Foundation repair-install 25 piers and mud-jack 824sqft
- 6939 Santa Monica DrDec 15, 2025Nsfaa remodel of existing kitchen and rear additionto single family dwelling
- 1623 Barry AveOct 15, 2025Run water lines and sewer lines for new bar 2 floor drains4 floor sinks2 hand sinks1 3 compartment sink1 grease trap
- 604 Parkview AveSep 29, 2025Electrical for addition
- 5526 E R L Thornton FwySep 16, 2025Renovation and building expansion of existing gas station convenience store, including addition of new quick service restaurant with drive-through. area: existing 1,588 + addition 2,412 = 4,000 sq ft total building
- 5526 East Rl Thornton Freeway · Modern Pyramids, Inc.Sep 3, 2025New quick service restaurant — additions to existing building — renovation and building expansion of existing gas station convenience store, including addition of new quick service restaurant with drive-through. area: existing 1,588 + addition 2,412 = 4,000 sq ft total building
- 3014 Reynolds AveAug 28, 2025Scope of work by construction phase:1. pre-construction planning & permitting• perform manual j load calculation for heating/cooling loads.• prepare manual d duct design for air distribution.• select hvac equipment per manual s sizing standards.• submit equipment specifications, cut sheets, and duct layout with permit package to city of dallas.• coordinate with builder/general contractor for mechanical chase, soffit, and utility penetration planning.2. rough-in stage (prior to insulation & drywall)• install all supply and return ductwork (r-8 insulated flexible duct for unconditioned spaces, per dallas/).• install sheet metal trunk lines, plenums, and boots per manual d layout.• install refrigerant line sets between indoor air handler/coil and outdoor condensing unit.• run condensate drain lines to approved termination points (with primary & secondary drains per imc §307).• install bathroom exhaust fans, kitchen vent ductwork, and dryer vent duct with exterior termination.• frame and set hvac platform (attic or mechanical closet as per plans).• install combustion air ducts (if gas furnace is used).• install venting for furnaces and water heaters (category iv pvc or b-vent, as applicable).• install gas piping to furnace (if applicable) with sediment traps, shutoff valve, and pressure test per ifgc.• provide fresh air intake/mechanical ventilation system in compliance with dallas energy code.• seal all ductwork connections with mastic or ul-listed tape (per ).3. equipment installation• install air handler/furnace unit in attic or mechanical closet.• install outdoor condensing unit on approved pad or platform, meeting dallas setback and clearance requirements.• connect refrigerant lines, pressure test, and evacuate system prior to charging.• install line-set insulation with uv protection where exposed.• connect electrical whips, disconnects, breakers, and thermostat wiring per nec.• connect gas piping (if applicable), perform pressure test, and verify for leaks.• set and level drain pans with float switches and secondary drains.• install supply registers, return grilles, exhaust grilles in planned locations.________________________________________4. trim-out & final connections• install programmable thermostat(s) per requirements.• install final supply/return registers and grilles.• install bath exhaust fan trim kits and kitchen vent termination hood.• seal penetrations at ceiling/walls for air barrier integrity.• charge refrigerant system per manufacturer specs and dallas code requirements.• balance air distribution system to provide correct airflow to each room.• verify combustion air and venting operation (if gas furnace).• test condensate drains for proper slope and drainage.________________________________________5. testing, commissioning & final inspection• perform duct leakage testing per (? 4 cfm/100 sq ft at 25 pa).• perform airflow balancing for proper cfm per room.• test gas piping and connections for leaks.• verify thermostat and system operational controls.• provide manufacturer startup sheets, equipment model/serials, and balancing report to homeowner and inspector.• schedule city of dallas final inspection for mechanical systems.________________________________________owner-supplied vs. contractor-supplied• contractor will provide and install all hvac equipment, ductwork, registers, grills, refrigerant piping, gas piping, and associated materials unless otherwise noted.• builder/homeowner to coordinate mechanical chase framing and access to electrical service.exclusions• removal of asbestos or hazardous materials.• structural modifications not shown in hvac plans.• utility company fees for gas or electrical service upgrades
- 5423 Gurley AveJun 2, 2025Relocate gas meter to the backyard
- 4719 Barry AveMay 20, 2025Installed 40 gal slim water heater in kitchen closet
Questions
What restaurants are being built in Dallas 75223?
27 addresses in 75223 have permits or project filings for restaurants in the last two years. The most recent was filed at 516 Grandview Ave. Others include 1001 Sarasota Cir, 3219 Fairview Ave, 1118 Valencia St.
How can I find out when a new restaurant is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new restaurant permit is filed.