519 Cordova St
Dallas, TX 75223
Home repairs and renovations permitted at 519 Cordova St
City of Dallas permits indicate repairs and renovations to a home at 519 Cordova St, not a new building. The work includes foundation repairs permitted July 3, 2025, renovations to the kitchen and two bathrooms permitted March 2, 2026, and porch-pillar and balustrade work permitted June 16, 2026.
Summarized from City of Dallas records · updated Jun 16, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jun 16, 2026
- since Jul 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsRepointing disassembly and reassembly of four separate pilars and balustrade between two of the pilars on the front porch. the two front porch pilars are 17x17 98 inches with a 30 x 144 x 8.5 inch balastrade connecting the pilars. and the two porto coche pilars are 21x21x98 inches.we have completed the pilars but await the repouring of the front porch to finish the connecting balustrade
Repointing disassembly and reassembly of four separate pilars and balustrade between two of the pilars on the front porch. the two front porch pilars are 17x17 98 inches with a 30 x 144 x 8.5 inch balastrade connecting the pilars. and the two porto coche pilars are 21x21x98 inches.we have completed the pilars but await the repouring of the front porch to finish the connecting balustrade
City of Dallas permitResidential Alteration Addition PermitSmall electrical remodel, add some recess cans, move some receptacles, add ucl lighting, add two circuits
Small electrical remodel, add some recess cans, move some receptacles, add ucl lighting, add two circuits
City of Dallas permitResidential Electrical PermitNsfaa renovate 2 bathrooms and kitchen. plumbing locations not changing. reusing existing electrical including fixtures. will need to patch the brick on the exterior
Nsfaa renovate 2 bathrooms and kitchen. plumbing locations not changing. reusing existing electrical including fixtures. will need to patch the brick on the exterior
City of Dallas permitResidential Alteration Addition PermitX install 12 total pilings (12 exterior).x install 60 lf of 2x10 joist.x install 95 lf of 4x10 beam.x install 5 pad and block supports.x install 15 lf of sill plate.x install 46 sq ft of subfloor.x install 10 vents.x reset/re-shim 878 sq ft of the foundation
X install 12 total pilings (12 exterior).x install 60 lf of 2x10 joist.x install 95 lf of 4x10 beam.x install 5 pad and block supports.x install 15 lf of sill plate.x install 46 sq ft of subfloor.x install 10 vents.x reset/re-shim 878 sq ft of the foundation
City of Dallas permitResidential Foundation Repair
Sources: City of Dallas
Questions about 519 Cordova St
What is being built at 519 Cordova St, Dallas?
City of Dallas records show repairs and renovations to a home, including foundation work, kitchen and bathroom renovations, and porch repairs. The records provided do not describe a new building.
Is a restaurant opening at 519 Cordova St?
The detailed City of Dallas permits describe residential work, including home renovations and repairs. They do not identify a restaurant or restaurant opening.
When were permits filed for work at 519 Cordova St?
The records span July 3, 2025, through June 16, 2026. The latest listed permit, RES-ALT-ADD-25-001430, was filed June 16, 2026, for porch-pillar and balustrade work.
What renovation work is planned at 519 Cordova St?
A March 2, 2026, alteration permit, RES-ALT-ADD-26-000148, describes renovating two bathrooms and the kitchen. It says the plumbing locations will stay the same and existing electrical fixtures will be reused.
Is the foundation being repaired at 519 Cordova St?
Yes. A July 3, 2025, foundation-repair permit, RES-FDN-25-000207, describes installing 12 pilings and resetting and re-shimming 878 square feet of the foundation.
What work is happening on the front porch at 519 Cordova St?
A June 16, 2026, permit, RES-ALT-ADD-25-001430, describes repointing, disassembling, and reassembling four pillars and a balustrade between two front-porch pillars. The permit description says the pillars were completed while work on the balustrade awaited the front porch being repoured.
Also being built nearby
All of 75223- 527 Cordova StJan 7, 2026Private residential ev charger tied into existing msp #6 cu, #8cu gnd, 3/4" emt or equivalent feeder conductors sized per: nec 625.21, 310.16 · 9 m away
- 510 Cordova StFeb 10, 20263.5 ton complete · 16 m away
- 503 Cordova StNov 12, 2025Install 12 concrete pilings.adjust 8 existing pilings.install 28 lf of 2x4 sill plate.reset/re-shim 326 sq ft of the foundation with steel shims · 18 m away
- 502 Cordova StNov 10, 2020Replace or modify existing hvac · 22 m away
- 519 Valencia StJun 12, 2026Repair the drain waste and vent system below home and add sewer clean-outs · 102 m away
- 511 Valencia StJan 25, 2021Gas relay or repair with test · 102 m away
- 503 Valencia StJan 27, 2021Gas relay or repair with test · 103 m away
- 607 Cordova StFeb 25, 2026Single-story residential house demolition and disposal consisting of approximately 1640 square feet plus detached garage · 107 m away
- 422 Cordova StFeb 16, 2026200 amp panel and meter base replacement · 108 m away
- 609 Cordova StNov 10, 2026Nsfaa-demolition old house and build a new construction house · 109 m away
- 603 Cordova StJan 28, 2021Foundation repair · 112 m away
- 612 Cordova StApr 9, 2026Install electrical system on addition · 114 m away
More restaurants in 75223.