1925 Corinth St
Dallas, TX 75215
Two four-story, five-unit townhome buildings planned
City of Dallas permits indicate two four-story multifamily townhome buildings, with five units each, at 1925 Corinth St. New-construction and site-work permits were filed May 15, 2026, followed by plumbing, electrical and mechanical permits. A sidewalk and curb-gutter permit was filed November 4, 2026.
Summarized from City of Dallas records · updated Nov 4, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Nov 4, 2026
- since May 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
8 projectsCut and replace city sidewalk, approach, and curb gutter.cut demolition city sidewalk:(50'x4'x4")cut demolition approach:(18'x10'x6")cut curb gutter:(42'x2'1"x10")new city sidewalk:(50'x4'x4")new curb gutter:(42'x2'1"x10"new approach:(18'x10'x6")city sidewalk for permit number com-new-26-000543
Cut and replace city sidewalk, approach, and curb gutter.cut demolition city sidewalk:(50'x4'x4")cut demolition approach:(18'x10'x6")cut curb gutter:(42'x2'1"x10")new city sidewalk:(50'x4'x4")new curb gutter:(42'x2'1"x10"new approach:(18'x10'x6")city sidewalk for permit number com-new-26-000543
City of Dallas permitCommercial Drive Approach and Sidewalk PermitInstall new 4 ton hvac heat pump and air handler in 5 units. new duct work, exhaust fans, dryer fans and exhaust duct
Install new 4 ton hvac heat pump and air handler in 5 units. new duct work, exhaust fans, dryer fans and exhaust duct
City of Dallas permitCommercial Mechanical Permit
Sources: City of Dallas
Questions about 1925 Corinth St
What is being built at 1925 Corinth St?
City of Dallas permit COM-NEW-25-000184 describes two four-story multifamily townhome buildings with five units each. New-construction permits were filed May 15, 2026.
How many townhome units are planned at 1925 Corinth St?
The new-construction permit describes two buildings with five units each, for 10 units total. The permit was filed May 15, 2026.
How many stories are the townhomes at 1925 Corinth St?
The City of Dallas new-construction permit describes two four-story multifamily townhome buildings.
When were permits filed for 1925 Corinth St?
New-construction and site-work permits were filed May 15, 2026. Later permits cover plumbing, electrical and mechanical work, with the latest listed filing dated November 4, 2026.
What work is permitted at 1925 Corinth St?
The records include new construction and site work for the townhomes, plus plumbing, electrical and HVAC work. A November 4, 2026 permit covers sidewalk, approach and curb-gutter replacement.
Do the permits at 1925 Corinth St mention HVAC work?
Yes. Mechanical permit COM-MEC-26-001429, filed June 15, 2026, describes a new four-ton heat pump and air handler in five units, along with ductwork and exhaust equipment.
Also being built nearby
All of 75215- 1905 Corinth StApr 21, 2026Grading only building. 1 qteam · 12 m away
- 1916 Corinth StAug 11, 2026Service release no work [ vacant building ] · 19 m away
- 2104 S Harwood StAug 21, 2026New plumbingroof top · 56 m away
- 2104 S Harwood · Harwood Cedar LLCMay 17, 202421 harwood — new construction — 21 harwood is duplex project with 10 units · 56 m away
- 2102 S Harwood StAug 19, 2026New plumbing · 56 m away
- 1807 Corinth StAug 7, 2025Install electrical service for a charter power supply cabinet · 66 m away
- 2002 Corinth StAug 19, 2026New plumbing · 78 m away
- 2020 Park AveNov 4, 2026Cut and replace city sidewalkcut demolition cut city sidewalk (50'x4'x4")city sidewalk:(50'x4'x4")sidewalk work related to permit number, com-ph-new-26-000548 · 105 m away
- 2121 S Harwood StOct 6, 2025Install new rtu and provided ducting and air distribution · 107 m away
- 2007 Seegar StSep 15, 2025Qteam meeting 11.12.2025 (9am) two mixed use buildings a and b with retail shell on the first floor and 10 apartments each on the second floor. building a - first floor shell - 4918sfbuilding a - second floor apartments - 7927sfbuilding b - first floor shell - 4212sfbuilding b - second floor apartments - 7513sf · 125 m away
- 2201 S Harwood StJul 4, 2026Downtown dog operates a dog daycare and boarding facility where the safety and security of the dogs, employees, and customers is the highest priority. an 8-foot perimeter fence is necessary to prevent unauthorized access, deter trespassing, and provide a secure environment for dogs participating in outdoor play and overnight boarding. because the property is located along multiple public streets, the taller fence helps reduce the risk of dogs escaping and prevents interactions between the public and the animals in our care. it also improves employee safety by creating a controlled and secure work environment. the fence serves as a visual barrier that helps reduce distractions and barking, promoting a calmer environment for the dogs. overall, the 8-foot fence is an essential safety feature that supports responsible operation of the facility and protects both the public and the animals entrusted to our care · 133 m away
- 2121 S Cesar Chavez BlvdMar 4, 2026Installing new sewer main. sewer relay · 146 m away
More apartments & multifamily in 75215, demolitions in 75215, townhomes in 75215.