2201 S Harwood St
Dallas, TX 75215
Dog daycare and boarding facility gets fence and permit updates
City of Dallas permits filed from February 10 to July 4, 2026, describe fence work and permit updates for an existing dog daycare and boarding facility at 2201 S Harwood St. The filings say the current floor plan is unchanged and that no new walls or structural modifications are proposed. A July 4 permit describes an 8-foot perimeter fence for security.
Summarized from City of Dallas records · updated Jul 4, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Jul 4, 2026
- since Feb 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsDowntown dog operates a dog daycare and boarding facility where the safety and security of the dogs, employees, and customers is the highest priority. an 8-foot perimeter fence is necessary to prevent unauthorized access, deter trespassing, and provide a secure environment for dogs participating in outdoor play and overnight boarding. because the property is located along multiple public streets, the taller fence helps reduce the risk of dogs escaping and prevents interactions between the public and the animals in our care. it also improves employee safety by creating a controlled and secure work environment. the fence serves as a visual barrier that helps reduce distractions and barking, promoting a calmer environment for the dogs. overall, the 8-foot fence is an essential safety feature that supports responsible operation of the facility and protects both the public and the animals entrusted to our care
Downtown dog operates a dog daycare and boarding facility where the safety and security of the dogs, employees, and customers is the highest priority. an 8-foot perimeter fence is necessary to prevent unauthorized access, deter trespassing, and provide a secure environment for dogs participating in outdoor play and overnight boarding. because the property is located along multiple public streets, the taller fence helps reduce the risk of dogs escaping and prevents interactions between the public and the animals in our care. it also improves employee safety by creating a controlled and secure work environment. the fence serves as a visual barrier that helps reduce distractions and barking, promoting a calmer environment for the dogs. overall, the 8-foot fence is an essential safety feature that supports responsible operation of the facility and protects both the public and the animals entrusted to our care
City of Dallas permitCommercial Accessory Structure PermitThis permit submittal reflects the existing floor plan and current building layout. all improvements shown were completed prior to current ownership and occupancy. no new walls , structural modifications, or layout changes are proposed under this permit. the building has operated as a daycare and boarding facility over the past 17 years and we are the new owners applying to correct the certificate of occupancy previously submitted
This permit submittal reflects the existing floor plan and current building layout. all improvements shown were completed prior to current ownership and occupancy. no new walls , structural modifications, or layout changes are proposed under this permit. the building has operated as a daycare and boarding facility over the past 17 years and we are the new owners applying to correct the certificate of occupancy previously submitted
City of Dallas permitCommercial Alteration Addition PermitThis permit submittal reflects the existing floor plan and current building layout. all improvements shown were completed prior to current ownership and occupancy. no new walls , structural modifications, or layout changes are proposed under this permit. the building has operated as a daycare and boarding facility over the past 17 years and we are the new owners applying to correct the certificate of occupancy previously submitted
This permit submittal reflects the existing floor plan and current building layout. all improvements shown were completed prior to current ownership and occupancy. no new walls , structural modifications, or layout changes are proposed under this permit. the building has operated as a daycare and boarding facility over the past 17 years and we are the new owners applying to correct the certificate of occupancy previously submitted
City of Dallas permitCommercial New Construction PermitWe are removing chain link fencing on the exterior of the property and replacing the fence with new 8ft pine fencing and gates. everything is marked on the drawing that is attached
We are removing chain link fencing on the exterior of the property and replacing the fence with new 8ft pine fencing and gates. everything is marked on the drawing that is attached
City of Dallas permitCommercial Accessory Structure PermitInstalling 800lft of 6" pine sbs with kicker; 1 double swing gate 20ft and 1 double swing gate 22ft add knox box and keypads to gates
Installing 800lft of 6" pine sbs with kicker; 1 double swing gate 20ft and 1 double swing gate 22ft add knox box and keypads to gates
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 2201 S Harwood St
What is being built at 2201 S Harwood St in Dallas?
The permits describe work at an existing dog daycare and boarding facility, including fencing and permit updates. They do not describe a new building or changes to the existing floor plan.
Is a new dog daycare opening at 2201 S Harwood St?
The permit records describe a facility that has operated as a daycare and boarding facility for 17 years. A June 25, 2026, filing says the permit is to correct a previously submitted certificate of occupancy.
What is the fence work at 2201 S Harwood St?
A March 10, 2026, permit describes replacing exterior chain-link fencing with 8-foot pine fencing and gates. A July 4 permit describes an 8-foot perimeter fence for safety and security.
Are they building a new structure at 2201 S Harwood St?
The April 7, 2026, commercial new construction permit says the existing floor plan and building layout are reflected in the submittal. It says the improvements were completed before the current ownership and that no new walls, structural modifications, or layout changes are proposed.
What permits were filed for 2201 S Harwood St?
The City of Dallas records list five permits filed between February 10 and July 4, 2026. They cover fencing and permit updates for the existing daycare and boarding facility.
Also being built nearby
All of 75215- 2220 S Harwood StMar 13, 2026Gas test · 26 m away
- 2121 S Harwood StOct 6, 2025Install new rtu and provided ducting and air distribution · 28 m away
- 2080 Kelly AveDec 18, 2025New building associate with permit #2102241063_162172696-004 · 87 m away
- 2121 S Cesar Chavez BlvdMar 4, 2026Installing new sewer main. sewer relay · 106 m away
- 1916 Corinth StAug 11, 2026Service release no work [ vacant building ] · 119 m away
- 2002 Corinth StAug 19, 2026New plumbing · 131 m away
- 1905 Corinth StApr 21, 2026Grading only building. 1 qteam · 132 m away
- 1925 Corinth StNov 4, 2026Cut and replace city sidewalk, approach, and curb gutter.cut demolition city sidewalk:(50'x4'x4")cut demolition approach:(18'x10'x6")cut curb gutter:(42'x2'1"x10")new city sidewalk:(50'x4'x4")new curb gutter:(42'x2'1"x10"new approach:(18'x10'x6")city sidewalk for permit number com-new-26-000543 · 133 m away
- 2104 S Harwood · Harwood Cedar LLCMay 17, 202421 harwood — new construction — 21 harwood is duplex project with 10 units · 133 m away
- 2104 S Harwood StAug 21, 2026New plumbingroof top · 133 m away
- 2102 S Harwood StAug 19, 2026New plumbing · 135 m away
- 1807 Corinth StAug 7, 2025Install electrical service for a charter power supply cabinet · 140 m away