2509 South Blvd
Dallas, TX 75215
2509 South Blvd: 1 project on record
City of Dallas lists 1 filing across 1 project at 2509 South Blvd, Dallas, TX 75215. The most recent, filed July 30, 2025, covers: “Building 8 ft fence at the rear of the property”.
Compiled from City of Dallas records · updated Jul 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 30, 2025
- since Jul 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2509 South Blvd
What is being built at 2509 South Blvd?
The latest filing (City of Dallas permit RES-ACC-25-000264, July 30, 2025) covers building 8 ft fence at the rear of the property.
How many permits and filings does 2509 South Blvd have?
1 filing across 1 project, from July 30, 2025 to July 30, 2025.
What is being built near Guide Right Foundation in Dallas?
2509 South Blvd is about 134 m from Guide Right Foundation (2519 Martin Luther King Jr Blvd). Its latest filing is for building 8 ft fence at the rear of the property.
Is there other construction near 2509 South Blvd?
Yes. Nearby filings include 2501 South Blvd (gas pressure test, Jun 10, 2025); 2521 South Blvd (gas test, Jun 9, 2025); 2424 South Blvd (no service no work, Mar 5, 2026).
How do I get alerts for new permits at 2509 South Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 2501 South BlvdJun 10, 2025Gas pressure test · 11 m away
- 2521 South BlvdJun 9, 2025Gas test · 17 m away
- 2424 South BlvdMar 5, 2026No service no work · 120 m away
- 2420 South BlvdJun 30, 2025Gas test · 126 m away
- 2509 Martin Luther King Jr BlvdJul 17, 2025Install a pergola structure in the parking lot · 133 m away
- 2519 Martin Luther King Jr Blvd · Guide Right FoundationDec 17, 2025Reconstruct an existing 4,780 square foot, two-story fraternity youth outreach & resource center utilizing wood-frame construction with a colonial-style, masonry mixed-finish exterior, including interior improvements · 134 m away
- 2508 Park Row AveJun 15, 202620 combination hybrid piers1 exterior concrete breakout and repatch 2x236 ft of lineal feet of girder · 134 m away
- 2502 Park Row AveSep 24, 2025Gas test · 135 m away
- 2522 Park Row AveJul 30, 2024Building a new 2 story residential house in park row ave · 136 m away
- 2601 South BlvdMay 27, 2026Gas test. gas service has been off · 141 m away
- 2409 South BlvdOct 20, 2026Installation of:15 concrete piers33 pad and blocks300 ft of treated beam700 square ft of crawl spacethis is to provide stabilization · 142 m away
- 2500 Martin Luther King Jr BlvdNov 13, 2025Re roof shingles · 147 m away