2519 Martin Luther King Jr Blvd
Dallas, TX 75215 · Guide Right Foundation
Youth outreach and resource center permitted at 2519 MLK Jr Blvd
A 4,780-square-foot fraternity youth outreach and resource center is planned for 2519 Martin Luther King Jr Blvd. Dallas issued a commercial new-construction permit on December 17, 2025, to reconstruct the existing two-story center; a TDLR registration filed June 16, 2025, describes a 2⅓-story wood-frame building with a parking lot and landscaping. The applicant estimated the project cost at $450,000.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Dec 17, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 17, 2025
- since Jun 16, 2025
- Largest scope
- 4,780 sf
- Estimated cost
- $450K
- state registration
Where this project stands
Finishing up · inspection nextHome of GRF
4,780 sq ft · $450K est.
- RegisteredJun 16, 2025
- Plan review
- ConstructionAug '25 – Aug '26
- Inspectednow
- Closed
Scheduled to finish Aug 3, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsReconstruct an existing 4,780 square foot, two-story fraternity youth outreach & resource center utilizing wood-frame construction with a colonial-style, masonry mixed-finish exterior, including interior improvements
Reconstruct an existing 4,780 square foot, two-story fraternity youth outreach & resource center utilizing wood-frame construction with a colonial-style, masonry mixed-finish exterior, including interior improvements
City of Dallas permitCommercial New Construction PermitConstruction of a 2-1/3 story wood frame building with brick and hardie exterior, with a parking lot and landscaping. — guide right foundation
TDLR project registrationNew ConstructionReview Complete4,780 sq ft$450K est.- Project #
- TABS2025021341
- Tenant / owner
- Home Of Grf
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 2519 Martin Luther King Jr Blvd
What is being built at 2519 Martin Luther King Jr Blvd in Dallas?
Permit records describe reconstruction of a 4,780-square-foot fraternity youth outreach and resource center. The TDLR registration also describes a wood-frame building with a parking lot and landscaping.
When was the project at 2519 Martin Luther King Jr Blvd permitted?
Dallas issued commercial new-construction permit COM-NEW-25-000299 on December 17, 2025. The TDLR project registration, TABS2025021341, was filed June 16, 2025.
How large is the new youth resource center on Martin Luther King Jr Blvd?
The project records identify a building of 4,780 square feet. The Dallas permit describes the existing center as two stories, while the TDLR registration describes a 2⅓-story building.
What will the building at 2519 Martin Luther King Jr Blvd look like?
The TDLR registration describes wood-frame construction with a brick and Hardie exterior. The Dallas permit describes a colonial-style, mixed-finish masonry exterior.
How much is the 2519 Martin Luther King Jr Blvd project expected to cost?
The TDLR registration lists an applicant-estimated project cost of $450,000. This is an estimate, not a reported final cost.
Is the project at 2519 Martin Luther King Jr Blvd a youth center?
The Dallas permit describes the project as a fraternity youth outreach and resource center. The permit does not identify an occupant or owner.
Also being built nearby
All of 75215- 2509 Martin Luther King Jr BlvdJul 17, 2025Install a pergola structure in the parking lot · 15 m away
- 2500 Martin Luther King Jr BlvdNov 13, 2025Re roof shingles · 29 m away
- 2434 Martin Luther King Jr BlvdDec 9, 2025Gas test · 122 m away
- 2521 South BlvdJun 9, 2025Gas test · 133 m away
- 2509 South BlvdJul 30, 2025Building 8 ft fence at the rear of the property · 134 m away
- 2501 South BlvdJun 10, 2025Gas pressure test · 135 m away
- 2606 Martin Luther King Jr BlvdJul 28, 2026Partial to total demolition of existing installation that feeds existing ac units, also new installation requires emt conduit, disconnects and partial to total wiring to be run for new ac units that are going to be installed for hvac contractor · 138 m away
- 2512 Peabody AveNov 3, 2025New construction · 140 m away
- 2520 Peabody AveDec 23, 2025New hvac system · 140 m away
- 2510 Peabody AveNov 3, 2025New construction · 140 m away
- 2522 Peabody AveDec 2, 2025New hvac system · 140 m away
- 2508 Peabody AveNov 3, 2025New construction · 140 m away