2606 Martin Luther King Jr Blvd
Dallas, TX 75215
Electrical work for new HVAC units at 2606 MLK Jr Blvd
An electrical permit covers removal of some or all of the existing wiring that feeds the air-conditioning units and installation of conduit, disconnects and wiring for new AC units. The City of Dallas permit was filed July 28, 2026; it does not describe demolition of the building.
Summarized from City of Dallas records · updated Jul 28, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 28, 2026
- since Jul 28, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectPartial to total demolition of existing installation that feeds existing ac units, also new installation requires emt conduit, disconnects and partial to total wiring to be run for new ac units that are going to be installed for hvac contractor
Partial to total demolition of existing installation that feeds existing ac units, also new installation requires emt conduit, disconnects and partial to total wiring to be run for new ac units that are going to be installed for hvac contractor
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 2606 Martin Luther King Jr Blvd
What is being built at 2606 Martin Luther King Jr Blvd?
A City of Dallas electrical permit covers wiring work for new AC units, including EMT conduit, disconnects and partial-to-total wiring. It was filed July 28, 2026, under permit COM-ELC-26-003394.
Is the building at 2606 Martin Luther King Jr Blvd being demolished?
The permit describes partial-to-total demolition of the existing electrical installation that feeds the AC units, not demolition of the building.
What HVAC work is planned at 2606 Martin Luther King Jr Blvd?
The permit description refers to new AC units and related electrical work. It does not provide details about the units or a construction schedule.
When was the permit filed for 2606 Martin Luther King Jr Blvd?
The City of Dallas electrical permit, COM-ELC-26-003394, was filed July 28, 2026.
Is there HVAC work nearby on Martin Luther King Jr Blvd?
A separate City of Dallas record at 2610 Martin Luther King Jr Blvd describes replacement of existing HVAC equipment. It was filed July 22, 2026.
Also being built nearby
All of 75215- 2610 Martin Luther King Jr BlvdJul 22, 2026Commercial hvac replacement at an existing occupied building. remove and replace existing rooftop packaged hvac units with like-for-like equipment of equivalent nominal capacity, fuel type and electrical characteristics, installed on existing roof curbs or approved curb adapters and connected to existing duct systems. remove and replace seven existing first-floor split hvac systems, including matched indoor furnaces, evaporator coils, controls and outdoor condensing units. relocate the seven outdoor condensing units from existing grade-level locations to engineered exterior wall-mounted support brackets approximately 10 feet above finished grade for security. reuse existing duct distribution. include refrigerant piping, condensate disposal, gas and electrical reconnections, controls, startup and commissioning. no change of use or occupancy. no vrf or doas work · 6 m away
- 2612 Martin Luther King Jr BlvdJul 22, 2026Hvac like for like replacement with electrical update of 50+ year old building to current code compliance. currently, (7) condensing units sit on the ground caged but not truly secured. we're using side discharge condensing units on wall mounts 10' from ground level- increasing security by access. and side discharge units have far less copper in their design. (3) roof top units will be replaced like for like. there will no vrf or doas modifications. overall building mechanical systems will remain air-to-air · 9 m away
- 2614 Martin Luther King Jr BlvdJul 22, 2026Testing the gas line to bring it back up to service · 12 m away
- 2618 Martin Luther King Jr BlvdJan 19, 2021Replace or modify existing hvac · 17 m away
- 2633 Peabody AveAug 25, 2026New hvac · 121 m away
- 2602 Peabody AveSep 18, 2025Gas test · 128 m away
- 2606 South BlvdJan 13, 2021Remodel existing plumbing · 132 m away
- 3011 Myrtle StSep 17, 2026House has burnt down to pile of debris. will attach pictures. remove all debris from house and shed · 133 m away
- 2519 Martin Luther King Jr Blvd · Guide Right FoundationDec 17, 2025Reconstruct an existing 4,780 square foot, two-story fraternity youth outreach & resource center utilizing wood-frame construction with a colonial-style, masonry mixed-finish exterior, including interior improvements · 138 m away
- 2601 South BlvdMay 27, 2026Gas test. gas service has been off · 145 m away
- 2617 South BlvdOct 30, 2026Gas test · 146 m away
- 3016 Myrtle StJun 26, 2026Nsfaa new build · 147 m away
More demolitions in 75215.