2614 Martin Luther King Jr Blvd
Dallas, TX 75215
Gas line testing permitted at 2614 Martin Luther King Jr Blvd
A commercial plumbing permit at 2614 Martin Luther King Jr Blvd covers testing the gas line to bring it back into service. The City of Dallas permit was filed on July 22, 2026, under permit COM-PLM-26-002691.
Summarized from City of Dallas records · updated Jul 22, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 22, 2026
- since Jul 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2614 Martin Luther King Jr Blvd
What is being done at 2614 Martin Luther King Jr Blvd?
A City of Dallas commercial plumbing permit covers testing the gas line to bring it back into service. The permit was filed July 22, 2026.
What is permit COM-PLM-26-002691 for?
It is for testing the gas line at 2614 Martin Luther King Jr Blvd to bring it back into service. The City of Dallas filed the permit on July 22, 2026.
Is a new building being built at 2614 Martin Luther King Jr Blvd?
The available permit describes gas line testing, not new construction. It does not list a building size or construction value.
Is a business opening at 2614 Martin Luther King Jr Blvd?
The permit record does not identify a business or say that one is opening. It covers testing the gas line.
When was the gas line permit filed for 2614 Martin Luther King Jr Blvd?
The City of Dallas filed commercial plumbing permit COM-PLM-26-002691 on July 22, 2026.
Also being built nearby
All of 75215- 2612 Martin Luther King Jr BlvdJul 22, 2026Hvac like for like replacement with electrical update of 50+ year old building to current code compliance. currently, (7) condensing units sit on the ground caged but not truly secured. we're using side discharge condensing units on wall mounts 10' from ground level- increasing security by access. and side discharge units have far less copper in their design. (3) roof top units will be replaced like for like. there will no vrf or doas modifications. overall building mechanical systems will remain air-to-air · 3 m away
- 2618 Martin Luther King Jr BlvdJan 19, 2021Replace or modify existing hvac · 6 m away
- 2610 Martin Luther King Jr BlvdJul 22, 2026Commercial hvac replacement at an existing occupied building. remove and replace existing rooftop packaged hvac units with like-for-like equipment of equivalent nominal capacity, fuel type and electrical characteristics, installed on existing roof curbs or approved curb adapters and connected to existing duct systems. remove and replace seven existing first-floor split hvac systems, including matched indoor furnaces, evaporator coils, controls and outdoor condensing units. relocate the seven outdoor condensing units from existing grade-level locations to engineered exterior wall-mounted support brackets approximately 10 feet above finished grade for security. reuse existing duct distribution. include refrigerant piping, condensate disposal, gas and electrical reconnections, controls, startup and commissioning. no change of use or occupancy. no vrf or doas work · 6 m away
- 2606 Martin Luther King Jr BlvdJul 28, 2026Partial to total demolition of existing installation that feeds existing ac units, also new installation requires emt conduit, disconnects and partial to total wiring to be run for new ac units that are going to be installed for hvac contractor · 12 m away
- 2633 Peabody AveAug 25, 2026New hvac · 118 m away
- 3011 Myrtle StSep 17, 2026House has burnt down to pile of debris. will attach pictures. remove all debris from house and shed · 122 m away
- 2602 Peabody AveSep 18, 2025Gas test · 129 m away
- 2606 South BlvdJan 13, 2021Remodel existing plumbing · 133 m away
- 3016 Myrtle StJun 26, 2026Nsfaa new build · 135 m away
- 2707 Martin Luther King Jr BlvdSep 6, 2026Service release no work 2707 martin luther king jr blvd ste 100 dallas, tx 75215 · 143 m away
- 2617 South BlvdOct 30, 2026Gas test · 145 m away
- 2621 South BlvdSep 11, 2020Electrical repairs · 145 m away