3011 Myrtle St
Dallas, TX 75215
Dallas permit covers debris removal at 3011 Myrtle St
A residential demolition permit covers removal of debris from a burned house and shed at 3011 Myrtle St. The City of Dallas permit was filed September 17, 2026, under permit number RES-DEM-26-000874.
Summarized from City of Dallas records · updated Sep 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2026
- since Sep 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectHouse has burnt down to pile of debris. will attach pictures. remove all debris from house and shed
House has burnt down to pile of debris. will attach pictures. remove all debris from house and shed
City of Dallas permitResidential Demolition Permit
Sources: City of Dallas
Questions about 3011 Myrtle St
What is happening at 3011 Myrtle St in Dallas?
A City of Dallas residential demolition permit covers removal of debris from a house and shed. The permit description says the house burned down.
Is a new house being built at 3011 Myrtle St?
The record for this address is for residential demolition and debris removal. It does not list a new-build project.
When was the permit filed for 3011 Myrtle St?
The permit was filed September 17, 2026.
What is the permit number for 3011 Myrtle St?
The City of Dallas residential demolition permit number is RES-DEM-26-000874.
Does the 3011 Myrtle St permit cover the shed too?
Yes. The permit description says debris is to be removed from the house and shed.
Also being built nearby
All of 75215- 3016 Myrtle StJun 26, 2026Nsfaa new build · 15 m away
- 2707 Martin Luther King Jr BlvdSep 6, 2026Service release no work 2707 martin luther king jr blvd ste 100 dallas, tx 75215 · 32 m away
- 2716 Martin Luther King Jr BlvdMar 14, 2026Mcr the goal is to create an additional suite, effectively dividing this property into two separate suites: suite a on the right side and suite b on the left.the space is currently being partitioned to form suite b. a new bathroom, air conditioning system, and electrical wiring are being installed. a door located at the rear of the property is being removed.additionally, a new utility meter and electrical panel are being installed · 38 m away
- 2703 Peabody AveFeb 9, 2026New construction electrical rough in and trim out · 104 m away
- 2618 Martin Luther King Jr BlvdJan 19, 2021Replace or modify existing hvac · 116 m away
- 2614 Martin Luther King Jr BlvdJul 22, 2026Testing the gas line to bring it back up to service · 122 m away
- 2612 Martin Luther King Jr BlvdJul 22, 2026Hvac like for like replacement with electrical update of 50+ year old building to current code compliance. currently, (7) condensing units sit on the ground caged but not truly secured. we're using side discharge condensing units on wall mounts 10' from ground level- increasing security by access. and side discharge units have far less copper in their design. (3) roof top units will be replaced like for like. there will no vrf or doas modifications. overall building mechanical systems will remain air-to-air · 125 m away
- 2610 Martin Luther King Jr BlvdJul 22, 2026Commercial hvac replacement at an existing occupied building. remove and replace existing rooftop packaged hvac units with like-for-like equipment of equivalent nominal capacity, fuel type and electrical characteristics, installed on existing roof curbs or approved curb adapters and connected to existing duct systems. remove and replace seven existing first-floor split hvac systems, including matched indoor furnaces, evaporator coils, controls and outdoor condensing units. relocate the seven outdoor condensing units from existing grade-level locations to engineered exterior wall-mounted support brackets approximately 10 feet above finished grade for security. reuse existing duct distribution. include refrigerant piping, condensate disposal, gas and electrical reconnections, controls, startup and commissioning. no change of use or occupancy. no vrf or doas work · 128 m away
- 2606 Martin Luther King Jr BlvdJul 28, 2026Partial to total demolition of existing installation that feeds existing ac units, also new installation requires emt conduit, disconnects and partial to total wiring to be run for new ac units that are going to be installed for hvac contractor · 133 m away
- 2633 Peabody AveAug 25, 2026New hvac · 140 m away
- 2602 Peabody AveSep 18, 2025Gas test · 180 m away
- 2635 South BlvdFeb 13, 2026Gas pressure test · 181 m away