2707 Martin Luther King Jr Blvd
Dallas, TX 75215
Electrical service release filed at 2707 Martin Luther King Jr Blvd
A City of Dallas commercial electrical permit filed September 6, 2026, records a service release with no work at 2707 Martin Luther King Jr Blvd, Suite 100. The permit does not describe a new building or other construction.
Summarized from City of Dallas records · updated Sep 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 6, 2026
- since Sep 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2707 Martin Luther King Jr Blvd
What is happening at 2707 Martin Luther King Jr Blvd in Dallas?
A City of Dallas commercial electrical permit records a service release with no work at the address. It was filed September 6, 2026.
Is anything being built at 2707 Martin Luther King Jr Blvd?
The permit description says “service release no work.” It does not indicate that a building is being constructed.
What does the permit at 2707 Martin Luther King Jr Blvd cover?
Permit COM-ELC-26-004397 is a commercial electrical permit for a service release with no work.
When was the permit filed for 2707 Martin Luther King Jr Blvd?
The City of Dallas permit was filed September 6, 2026.
Is a new business opening at 2707 Martin Luther King Jr Blvd?
The permit record does not name a business or indicate an opening. It describes a service release with no work.
Also being built nearby
All of 75215- 2716 Martin Luther King Jr BlvdMar 14, 2026Mcr the goal is to create an additional suite, effectively dividing this property into two separate suites: suite a on the right side and suite b on the left.the space is currently being partitioned to form suite b. a new bathroom, air conditioning system, and electrical wiring are being installed. a door located at the rear of the property is being removed.additionally, a new utility meter and electrical panel are being installed · 19 m away
- 3011 Myrtle StSep 17, 2026House has burnt down to pile of debris. will attach pictures. remove all debris from house and shed · 32 m away
- 3016 Myrtle StJun 26, 2026Nsfaa new build · 33 m away
- 2703 Peabody AveFeb 9, 2026New construction electrical rough in and trim out · 127 m away
- 2618 Martin Luther King Jr BlvdJan 19, 2021Replace or modify existing hvac · 137 m away
- 2614 Martin Luther King Jr BlvdJul 22, 2026Testing the gas line to bring it back up to service · 143 m away
- 2612 Martin Luther King Jr BlvdJul 22, 2026Hvac like for like replacement with electrical update of 50+ year old building to current code compliance. currently, (7) condensing units sit on the ground caged but not truly secured. we're using side discharge condensing units on wall mounts 10' from ground level- increasing security by access. and side discharge units have far less copper in their design. (3) roof top units will be replaced like for like. there will no vrf or doas modifications. overall building mechanical systems will remain air-to-air · 146 m away
- 2610 Martin Luther King Jr BlvdJul 22, 2026Commercial hvac replacement at an existing occupied building. remove and replace existing rooftop packaged hvac units with like-for-like equipment of equivalent nominal capacity, fuel type and electrical characteristics, installed on existing roof curbs or approved curb adapters and connected to existing duct systems. remove and replace seven existing first-floor split hvac systems, including matched indoor furnaces, evaporator coils, controls and outdoor condensing units. relocate the seven outdoor condensing units from existing grade-level locations to engineered exterior wall-mounted support brackets approximately 10 feet above finished grade for security. reuse existing duct distribution. include refrigerant piping, condensate disposal, gas and electrical reconnections, controls, startup and commissioning. no change of use or occupancy. no vrf or doas work · 149 m away
- 2606 Martin Luther King Jr BlvdJul 28, 2026Partial to total demolition of existing installation that feeds existing ac units, also new installation requires emt conduit, disconnects and partial to total wiring to be run for new ac units that are going to be installed for hvac contractor · 154 m away
- 2633 Peabody AveAug 25, 2026New hvac · 172 m away
- 2635 South BlvdFeb 13, 2026Gas pressure test · 173 m away
- 2822 Martin Luther King Jr BlvdAug 11, 2026Temporary electrical services for vacant office · 179 m away