Two EV chargers planned for a police parking lot
A City of Dallas electrical permit filed October 23, 2026, covers installing two EV chargers in the fenced police parking lot at 2538 S Ervay St. The permit describes two 48-amp GM PowerUp 2 chargers; it does not give a project cost or completion date.
Summarized from City of Dallas records · updated Oct 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 23, 2026
- since Oct 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInstall 2 ev charger in parking lot. fenced in police parking lot has 200a single phase service and panel with only parking lot light circuit. surface mount 1" rigid conduit on asphalt. run from breaker box 20ft along fence line to dual ev charger pedestal. install 2- gm power up 2, nema 4x, 48a 240v 1ph chargers. #4 thhwn copper
Install 2 ev charger in parking lot. fenced in police parking lot has 200a single phase service and panel with only parking lot light circuit. surface mount 1" rigid conduit on asphalt. run from breaker box 20ft along fence line to dual ev charger pedestal. install 2- gm power up 2, nema 4x, 48a 240v 1ph chargers. #4 thhwn copper
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 2538 S Ervay St
What is being built at 2538 S Ervay St?
A City of Dallas permit covers installation of two EV chargers in a fenced police parking lot. The permit, COM-ELC-26-005215, was filed October 23, 2026.
Are EV chargers planned at 2538 S Ervay St in Dallas?
Yes. The permit describes two 48-amp GM PowerUp 2 chargers for the parking lot.
When was the permit for the chargers at 2538 S Ervay St filed?
The City of Dallas filed electrical permit COM-ELC-26-005215 on October 23, 2026.
How many EV chargers are planned at 2538 S Ervay St?
The permit calls for two chargers in the parking lot.
When will the EV chargers at 2538 S Ervay St be installed?
The available permit record does not give an installation or completion date.
How much will the EV charger project at 2538 S Ervay St cost?
The permit record does not report a project cost.
Also being built nearby
All of 75215- 2500 S Ervay StAug 27, 2026Apt.207- changeout existing system. install 2 ton split system · 20 m away
- 2400 S Ervay StJul 2, 2026Repaling a exterior generator · 73 m away
- 1723 Kelly AveMay 1, 2026Demolish building. haul off debris. no trees · 183 m away
- 1604 Sanger AveDec 29, 2020Installation of (3) underground storage tanks, associated lines and fueling equipment. installed per · 203 m away
- 2220 S Ervay StNov 4, 2025800a service · 230 m away
- 2220 Ervay St · Low Ervay LLCFeb 7, 2025Power & light — new construction — public area includes drive area and leasing office (3,200 sq ft) · 230 m away
- 1803 Al Lipscomb WaySep 30, 2020Remove existing roof and install new roof · 249 m away
- 2204 S Ervay StMay 1, 2026Demolish building, hail off debris. no trees · 269 m away
- 2713 S Ervay StOct 9, 2026Plumbing scope · 277 m away
- 1700 Richardson AveMay 1, 2026Demolish building. haul of debris. no trees · 283 m away
- 2605 S Harwood StJun 10, 2026Main water line replacement · 300 m away
- 2604 Harwood Street · Masjid Al-Islam (mai), DallasFeb 12, 2024Masjid al-islam (mai), dallas — new construction — new place of worship, one story building. intended to be built into several phases, site work, then building shell, then interior finish out which is also intended to be done in 5 phases. total gross area 18,500 sq ft approximately · 306 m away