2604 Harwood Street
Dallas, TX 75215 · Masjid Al-Islam (mai), Dallas
Masjid Al-Islam plans an 18,500-square-foot worship building
A new, one-story place of worship for Masjid Al-Islam is planned at 2604 Harwood Street in Dallas. A TDLR project registration filed February 12, 2024, describes an approximately 18,500-square-foot building intended to be completed in phases. The applicant’s estimated project cost is $3.8 million.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 12, 2024
- since Feb 12, 2024
- Largest scope
- 18,500 sf
- Estimated cost
- $3.8M
- state registration
Where this project stands
Finishing up · inspection nextMASJID AL-ISLAM (MAI), DALLAS
18,500 sq ft · $3.8M est.
- RegisteredFeb 12, 2024
- Plan review
- ConstructionFeb '24 – Jun '26
- Inspectednow
- Closed
Scheduled to finish Jun 15, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectNew place of worship, one story building. intended to be built into several phases, site work, then building shell, then interior finish out which is also intended to be done in 5 phases. total gross area 18,500 sq ft approximately — masjid al-islam (mai), dallas
TDLR project registrationNew ConstructionReview Complete18,500 sq ft$3.8M est.- Project #
- TABS2024011297
- Tenant / owner
- Masjid Al-Islam (mai), Dallas
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2604 Harwood Street
What is being built at 2604 Harwood Street in Dallas?
A new, one-story place of worship for Masjid Al-Islam is planned at the address. The TDLR registration, filed February 12, 2024, lists approximately 18,500 square feet.
Is Masjid Al-Islam building a new mosque in Dallas?
The TDLR registration describes a new place of worship for Masjid Al-Islam at 2604 Harwood Street. It lists the project as new construction.
How big is the Masjid Al-Islam building planned for Harwood Street?
The project registration lists the planned building at approximately 18,500 square feet.
When was the Masjid Al-Islam project filed?
The TDLR project registration was filed February 12, 2024. Its status is listed as Review Complete.
How much is the Masjid Al-Islam project expected to cost?
The applicant’s estimated cost for the project is $3.8 million, according to its TDLR registration.
Will the Masjid Al-Islam building be built in phases?
Yes. The registration says work is intended to proceed through site work, the building shell, and interior finish-out, with the interior work planned in five phases.
What is being built near Purpose Palace On The Park in Dallas?
A new, one-story place of worship for Masjid Al-Islam is planned at 2604 Harwood Street, about 334 meters from Purpose Palace On The Park, according to the project information.
What is being built near Low Ervay in Dallas?
Masjid Al-Islam has a TDLR registration for a new place of worship at 2604 Harwood Street, about 454 meters from Low Ervay. The registration lists approximately 18,500 square feet.
Also being built nearby
All of 75215- 2605 S Harwood StJun 10, 2026Main water line replacement · 21 m away
- 2683 S Cesar Chavez BlvdAug 27, 2025Install new traffic signal service · 103 m away
- 1803 Al Lipscomb WaySep 30, 2020Remove existing roof and install new roof · 245 m away
- 2538 S Ervay StOct 23, 2026Install 2 ev charger in parking lot. fenced in police parking lot has 200a single phase service and panel with only parking lot light circuit. surface mount 1" rigid conduit on asphalt. run from breaker box 20ft along fence line to dual ev charger pedestal. install 2- gm power up 2, nema 4x, 48a 240v 1ph chargers. #4 thhwn copper · 306 m away
- 1830 Park Row AveOct 7, 2026New gas line installed to two furances 1 water heater 1 stove · 309 m away
- 2500 S Ervay StAug 27, 2026Apt.207- changeout existing system. install 2 ton split system · 314 m away
- 2424 S Cesar Chavez BlvdAug 18, 2026Work already done · 320 m away
- 2713 S Ervay StOct 9, 2026Plumbing scope · 332 m away
- 1810 Park Row Ave · Purpose Palace On The ParkAug 12, 2024Purpose palace on the park — renovation/alteration — renovation of an existing structure that includes daycare facilities on the first floor for children up to k-12 in age and living facilities on the second floor · 334 m away
- 2400 S Ervay StJul 2, 2026Repaling a exterior generator · 343 m away
- 1802 Park Row AveOct 15, 2026Electrical re-wire · 345 m away
- 2414 Park Row AveJan 9, 2026Gas test · 380 m away