Occupancy-related permit filings at 2424 S Cesar Chavez Blvd
Dallas records show a commercial alteration/addition permit application filed August 13, 2026, as part of the process to address a denied certificate of occupancy. The applicant said no remodeling or alterations were planned; a commercial electrical permit filed August 18 describes work already done.
Summarized from City of Dallas records · updated Aug 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 18, 2026
- since Aug 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsWe recently purchased the property and applied for a certificate of occupancy (co); however, the application was denied. we were informed that a commercial alteration/addition permit must be submitted prior to moving forward.on april 24, i met with the velocity team, and they advised that this permit application must be completed online. at this time, we have not made any alterations to the property. however, we are unable to confirm whether any prior work completed by the previous owner was properly permitted or in compliance with city requirements. as a result, we understand that we may need to address and resolve any outstanding issues to meet current city standards.at this time, we are not planning any remodeling or alterations. our goal is simply to comply with the city’s requirements and proceed with the recommended permit process so that we can begin operating our business as soon as possible
We recently purchased the property and applied for a certificate of occupancy (co); however, the application was denied. we were informed that a commercial alteration/addition permit must be submitted prior to moving forward.on april 24, i met with the velocity team, and they advised that this permit application must be completed online. at this time, we have not made any alterations to the property. however, we are unable to confirm whether any prior work completed by the previous owner was properly permitted or in compliance with city requirements. as a result, we understand that we may need to address and resolve any outstanding issues to meet current city standards.at this time, we are not planning any remodeling or alterations. our goal is simply to comply with the city’s requirements and proceed with the recommended permit process so that we can begin operating our business as soon as possible
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 2424 S Cesar Chavez Blvd
What is being built at 2424 S Cesar Chavez Blvd?
The available Dallas records do not describe a new building or planned remodeling. They show an application for a commercial alteration/addition permit related to a certificate of occupancy.
What is going in at 2424 S Cesar Chavez Blvd?
The records do not identify a business or tenant. The permit applicant said the application was intended to address city requirements so the business could begin operating.
Was a certificate of occupancy approved at 2424 S Cesar Chavez Blvd?
The applicant said a certificate of occupancy application had been denied and that the city required a commercial alteration/addition permit application before proceeding.
When were permits filed for 2424 S Cesar Chavez Blvd?
Dallas records list a commercial alteration/addition permit application dated August 13, 2026, and a commercial electrical permit dated August 18, 2026.
What work is planned at 2424 S Cesar Chavez Blvd?
The applicant said no remodeling or alterations were planned at the time of the August 13, 2026 filing. A separate electrical permit filed August 18 describes the work as already done.
What are the permit numbers for 2424 S Cesar Chavez Blvd?
The commercial alteration/addition permit application is COM-ALT-ADD-26-001013, filed August 13, 2026. The commercial electrical permit is COM-ELC-26-003939, filed August 18, 2026.
Also being built nearby
All of 75215- 2490 Coombs StOct 26, 2020Install lawn sprinkler · 199 m away
- 2080 Kelly AveDec 18, 2025New building associate with permit #2102241063_162172696-004 · 233 m away
- 2683 S Cesar Chavez BlvdAug 27, 2025Install new traffic signal service · 233 m away
- 2220 S Harwood StMar 13, 2026Gas test · 241 m away
- 2201 S Harwood StJul 4, 2026Downtown dog operates a dog daycare and boarding facility where the safety and security of the dogs, employees, and customers is the highest priority. an 8-foot perimeter fence is necessary to prevent unauthorized access, deter trespassing, and provide a secure environment for dogs participating in outdoor play and overnight boarding. because the property is located along multiple public streets, the taller fence helps reduce the risk of dogs escaping and prevents interactions between the public and the animals in our care. it also improves employee safety by creating a controlled and secure work environment. the fence serves as a visual barrier that helps reduce distractions and barking, promoting a calmer environment for the dogs. overall, the 8-foot fence is an essential safety feature that supports responsible operation of the facility and protects both the public and the animals entrusted to our care · 267 m away
- 2121 S Cesar Chavez BlvdMar 4, 2026Installing new sewer main. sewer relay · 273 m away
- 2102 S Cesar Chavez BlvdOct 21, 2026Relocate existing 2-inch domestic water supply line at commercial facility. connect to existing 2-inch copper water piping and install approximately 110 linear feet of new 2-inch uponor pex-a piping to designated interior building location. provide watertight foundation penetrations using link-seal assemblies, stub up piping within designated wall, and install shutoff valve. pressure-test new piping and inspect for leaks. excavation, backfill, concrete removal, and restoration by others. no new water meter or city water service connection proposed · 284 m away
- 2121 S Harwood StOct 6, 2025Install new rtu and provided ducting and air distribution · 288 m away
- 2601 Logan StOct 1, 2025Rpz backflow device replacement for the car wash bay equipment room. minor plumbing to reconnect · 304 m away
- 2604 Harwood Street · Masjid Al-Islam (mai), DallasFeb 12, 2024Masjid al-islam (mai), dallas — new construction — new place of worship, one story building. intended to be built into several phases, site work, then building shell, then interior finish out which is also intended to be done in 5 phases. total gross area 18,500 sq ft approximately · 320 m away
- 2605 S Harwood StJun 10, 2026Main water line replacement · 341 m away
- 2002 Corinth StAug 19, 2026New plumbing · 354 m away