2683 S Cesar Chavez Blvd
Dallas, TX 75215
New traffic signal service planned at 2683 S Cesar Chavez Blvd
A City of Dallas commercial electrical permit covers installation of new traffic signal service at 2683 S Cesar Chavez Blvd. The permit was filed on August 27, 2025.
Summarized from City of Dallas records · updated Aug 27, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 27, 2025
- since Aug 27, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2683 S Cesar Chavez Blvd
What is being built at 2683 S Cesar Chavez Blvd?
A City of Dallas permit indicates new traffic signal service will be installed at the address. It does not describe a new building.
What work is planned at 2683 S Cesar Chavez Blvd in Dallas?
The permitted work is installation of new traffic signal service. The commercial electrical permit was filed August 27, 2025.
When was the permit filed for 2683 S Cesar Chavez Blvd?
The City of Dallas filed permit COM-ELC-25-001758 on August 27, 2025.
Is a new building planned at 2683 S Cesar Chavez Blvd?
The available permit record describes installation of new traffic signal service, not construction of a new building.
What does permit COM-ELC-25-001758 cover?
The City of Dallas commercial electrical permit covers installation of new traffic signal service at 2683 S Cesar Chavez Blvd.
Also being built nearby
All of 75215- 2604 Harwood Street · Masjid Al-Islam (mai), DallasFeb 12, 2024Masjid al-islam (mai), dallas — new construction — new place of worship, one story building. intended to be built into several phases, site work, then building shell, then interior finish out which is also intended to be done in 5 phases. total gross area 18,500 sq ft approximately · 103 m away
- 2605 S Harwood StJun 10, 2026Main water line replacement · 123 m away
- 2424 S Cesar Chavez BlvdAug 18, 2026Work already done · 233 m away
- 2490 Coombs StOct 26, 2020Install lawn sprinkler · 304 m away
- 2414 Park Row AveJan 9, 2026Gas test · 346 m away
- 1803 Al Lipscomb WaySep 30, 2020Remove existing roof and install new roof · 349 m away
- 2424 Park Row AveJul 26, 2026Hvac change out · 354 m away
- 2538 S Ervay StOct 23, 2026Install 2 ev charger in parking lot. fenced in police parking lot has 200a single phase service and panel with only parking lot light circuit. surface mount 1" rigid conduit on asphalt. run from breaker box 20ft along fence line to dual ev charger pedestal. install 2- gm power up 2, nema 4x, 48a 240v 1ph chargers. #4 thhwn copper · 380 m away
- 2500 S Ervay StAug 27, 2026Apt.207- changeout existing system. install 2 ton split system · 384 m away
- 1830 Park Row AveOct 7, 2026New gas line installed to two furances 1 water heater 1 stove · 397 m away
- 2400 S Ervay StJul 2, 2026Repaling a exterior generator · 402 m away
- 2220 S Harwood StMar 13, 2026Gas test · 403 m away