2538 Southland St
Dallas, TX 75215
2538 Southland St: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 2538 Southland St, Dallas, TX 75215 since October 12, 2020. The most recent, filed October 18, 2020, covers: “Install new hvac”.
Compiled from City of Dallas records · updated Oct 18, 2020
- Projects
- 3
- 3 filings
- Latest filing
- Oct 18, 2020
- since Oct 12, 2020
- Largest scope
- —
- Listed value
- $35
- partial · often understated
Permit & project history
3 projectsSources: City of Dallas
Questions about 2538 Southland St
What is being built at 2538 Southland St?
The latest filing (City of Dallas permit 2010183004, October 18, 2020) covers install new hvac.
How many permits and filings does 2538 Southland St have?
3 filings across 3 projects, from October 12, 2020 to October 18, 2020.
How much is the construction at 2538 Southland St worth?
Permits at this address list about $35 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 2538 Southland St?
Yes. Nearby filings include 2531 Southland St (6 sinks 3 toilets 3 showers 2 hose bibs 1 washer box 2 ice maker box 1 kitchen sink 5 gas drops 1 gas water heater, Nov 16, 2026); 2515 Southland St (mcr roof mounted solar- 23 module 9.545kw, Oct 14, 2025); 2535 Elsie Faye Heggins St (upgrade electrical service, Oct 9, 2025).
How do I get alerts for new permits at 2538 Southland St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 2531 Southland StNov 16, 20266 sinks 3 toilets 3 showers 2 hose bibs 1 washer box 2 ice maker box 1 kitchen sink 5 gas drops 1 gas water heater · 19 m away
- 2515 Southland StOct 14, 2025Mcr roof mounted solar- 23 module 9.545kw · 45 m away
- 2535 Elsie Faye Heggins StOct 9, 2025Upgrade electrical service · 73 m away
- 2514 Marburg StSep 12, 2025Install new hvac system · 115 m away
- 2618 Elsie Faye Heggins StDec 30, 2020Installing 5.670kw roof mounted solar system · 120 m away
- 4430 Crozier StNov 17, 2026Install 9 total pilings (9 exterior) · 136 m away
- 2601 Marburg StApr 17, 2026The project requires removal and proper disposal of previous cedar fence. new fencing material will be added in the exact same place along the rear fence. the proposed side changes of the fence will be extended by 25 ft on the west side and 60 ft on the east side. the proposed new front fence will be built 6 ft high across the front of the residence in front property boundaries. all posts will be set in concrete approximately 6 ft a part, post side to face inward toward the property. the wood is 5/8-in x 5-1/8-in x 6-ft treated pine · 158 m away
- 2626 Southland StNov 29, 2025New construction · 159 m away
- 4763 Crozier StSep 30, 2020Additing equip to existing tower · 175 m away
- 4418 Crozier StNov 8, 202526 ft tunnel to repair sewer line · 178 m away
- 2638 Southland StMay 26, 2026New construction · 181 m away
- 2622 Marburg StFeb 12, 2026Install new system and new ducts · 181 m away