4430 Crozier St
Dallas, TX 75215
Foundation repair permit calls for nine pilings on Crozier St
A City of Dallas permit for commercial foundation repair at 4430 Crozier St covers installation of nine pilings, all exterior. The permit was filed on November 17, 2026, under permit COM-FDN-26-000145.
Summarized from City of Dallas records · updated Nov 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 17, 2026
- since Nov 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4430 Crozier St
What is happening at 4430 Crozier St in Dallas?
A City of Dallas commercial foundation repair permit covers installing nine pilings at the address. The record was filed November 17, 2026.
Is a new building being built at 4430 Crozier St?
The permit describes commercial foundation repair, not construction of a new building. Its listed work is installation of nine exterior pilings.
What work does permit COM-FDN-26-000145 cover?
The permit covers installation of nine total pilings, all exterior, for commercial foundation repair.
When was the foundation repair permit filed for 4430 Crozier St?
The City of Dallas permit was filed on November 17, 2026.
How many pilings are planned at 4430 Crozier St?
The permit record lists nine pilings in total, all exterior.
Also being built nearby
All of 75215- 2514 Marburg StSep 12, 2025Install new hvac system · 22 m away
- 4418 Crozier StNov 8, 202526 ft tunnel to repair sewer line · 42 m away
- 2530 Carpenter AveAug 18, 2025Replacing the condenser coil and furnace · 81 m away
- 2515 Southland StOct 14, 2025Mcr roof mounted solar- 23 module 9.545kw · 113 m away
- 2531 Southland StNov 16, 20266 sinks 3 toilets 3 showers 2 hose bibs 1 washer box 2 ice maker box 1 kitchen sink 5 gas drops 1 gas water heater · 119 m away
- 2538 Southland StOct 18, 2020Install new hvac · 136 m away
- 2601 Marburg StApr 17, 2026The project requires removal and proper disposal of previous cedar fence. new fencing material will be added in the exact same place along the rear fence. the proposed side changes of the fence will be extended by 25 ft on the west side and 60 ft on the east side. the proposed new front fence will be built 6 ft high across the front of the residence in front property boundaries. all posts will be set in concrete approximately 6 ft a part, post side to face inward toward the property. the wood is 5/8-in x 5-1/8-in x 6-ft treated pine · 162 m away
- 4502 Leland AveJul 29, 2026Mcr with battery 18.040 kw dc roof mount solar · 166 m away
- 4326 Crozier StJun 30, 2026Cold water line replacement 140 feet trenchless · 174 m away
- 4503 Leland AveNov 13, 2026Roofing , siding, flooring, windows, painting · 179 m away
- 2621 Marburg StNov 2, 2026Electrical raiser pipe repair · 198 m away
- 2614 Carpenter AveSep 24, 2025House rewire and service panel · 201 m away