2530 Carpenter Ave
Dallas, TX 75215
2530 Carpenter Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 2530 Carpenter Ave, Dallas, TX 75215. The most recent, filed August 18, 2025, covers: “Replacing the condenser coil and furnace”.
Compiled from City of Dallas records · updated Aug 18, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2025
- since Aug 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2530 Carpenter Ave
What is being built at 2530 Carpenter Ave?
The latest filing (City of Dallas permit RES-MEC-25-001989, August 18, 2025) covers replacing the condenser coil and furnace.
How many permits and filings does 2530 Carpenter Ave have?
1 filing across 1 project, from August 18, 2025 to August 18, 2025.
Is there other construction near 2530 Carpenter Ave?
Yes. Nearby filings include 4418 Crozier St (26 ft tunnel to repair sewer line, Nov 8, 2025); 4430 Crozier St (install 9 total pilings (9 exterior), Nov 17, 2026); 2514 Marburg St (install new hvac system, Sep 12, 2025).
How do I get alerts for new permits at 2530 Carpenter Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 4418 Crozier StNov 8, 202526 ft tunnel to repair sewer line · 65 m away
- 4430 Crozier StNov 17, 2026Install 9 total pilings (9 exterior) · 81 m away
- 2514 Marburg StSep 12, 2025Install new hvac system · 98 m away
- 4326 Crozier StJun 30, 2026Cold water line replacement 140 feet trenchless · 114 m away
- 2614 Carpenter AveSep 24, 2025House rewire and service panel · 152 m away
- 2601 Marburg StApr 17, 2026The project requires removal and proper disposal of previous cedar fence. new fencing material will be added in the exact same place along the rear fence. the proposed side changes of the fence will be extended by 25 ft on the west side and 60 ft on the east side. the proposed new front fence will be built 6 ft high across the front of the residence in front property boundaries. all posts will be set in concrete approximately 6 ft a part, post side to face inward toward the property. the wood is 5/8-in x 5-1/8-in x 6-ft treated pine · 155 m away
- 2622 Carpenter AveMay 28, 2025Replace electrical meter box · 167 m away
- 2621 Marburg StNov 2, 2026Electrical raiser pipe repair · 186 m away
- 2531 Southland StNov 16, 20266 sinks 3 toilets 3 showers 2 hose bibs 1 washer box 2 ice maker box 1 kitchen sink 5 gas drops 1 gas water heater · 186 m away
- 2515 Southland StOct 14, 2025Mcr roof mounted solar- 23 module 9.545kw · 188 m away
- 2622 Marburg StFeb 12, 2026Install new system and new ducts · 195 m away
- 2627 Marburg StSep 22, 2026Nsfaa-new construction - sfh · 195 m away