2622 Carpenter Ave
Dallas, TX 75215
2622 Carpenter Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 2622 Carpenter Ave, Dallas, TX 75215. The most recent, filed May 28, 2025, covers: “Replace electrical meter box”.
Compiled from City of Dallas records · updated May 28, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 28, 2025
- since May 28, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2622 Carpenter Ave
What is being built at 2622 Carpenter Ave?
The latest filing (City of Dallas permit RES-ELC-25-000389, May 28, 2025) covers replace electrical meter box.
How many permits and filings does 2622 Carpenter Ave have?
1 filing across 1 project, from May 28, 2025 to May 28, 2025.
Is there other construction near 2622 Carpenter Ave?
Yes. Nearby filings include 2614 Carpenter Ave (house rewire and service panel, Sep 24, 2025); 2621 Marburg St (electrical raiser pipe repair, Nov 2, 2026); 2627 Marburg St (nsfaa-new construction - sfh, Sep 22, 2026).
How do I get alerts for new permits at 2622 Carpenter Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 2614 Carpenter AveSep 24, 2025House rewire and service panel · 14 m away
- 2621 Marburg StNov 2, 2026Electrical raiser pipe repair · 90 m away
- 2627 Marburg StSep 22, 2026Nsfaa-new construction - sfh · 91 m away
- 2639 Marburg StMay 12, 2025New hvac and ductwork · 95 m away
- 2601 Marburg StApr 17, 2026The project requires removal and proper disposal of previous cedar fence. new fencing material will be added in the exact same place along the rear fence. the proposed side changes of the fence will be extended by 25 ft on the west side and 60 ft on the east side. the proposed new front fence will be built 6 ft high across the front of the residence in front property boundaries. all posts will be set in concrete approximately 6 ft a part, post side to face inward toward the property. the wood is 5/8-in x 5-1/8-in x 6-ft treated pine · 98 m away
- 2622 Marburg StFeb 12, 2026Install new system and new ducts · 103 m away
- 2615 Exline StJun 8, 2026X install 5 pad and block supports.x create 1 tunnel access.x replace 28.78 lf of crawlspace drop beam.x reset/re-shim 430.91 sq ft of the foundation · 128 m away
- 2642 Exline StMay 26, 2025Electrical service upgrade · 135 m away
- 2643 Exline StMay 19, 2025New construction- new drive approach and sidewalkrecord #2401121089_187137490-001 · 147 m away
- 2530 Carpenter AveAug 18, 2025Replacing the condenser coil and furnace · 167 m away
- 4317 Myrtle StOct 22, 2025Installations of hvac systems · 169 m away
- 2701 Marburg StMar 22, 2026Installation of new hvac system · 176 m away