2639 Marburg St
Dallas, TX 75215
2639 Marburg St: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 2639 Marburg St, Dallas, TX 75215 since May 11, 2025. The most recent, filed May 12, 2025, covers: “New hvac and ductwork”.
Compiled from City of Dallas records · updated May 12, 2025
- Projects
- 2
- 2 filings
- Latest filing
- May 12, 2025
- since May 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2639 Marburg St
What is being built at 2639 Marburg St?
The latest filing (City of Dallas permit RES-MEC-25-000111, May 12, 2025) covers new hvac and ductwork.
How many permits and filings does 2639 Marburg St have?
2 filings across 2 projects, from May 11, 2025 to May 12, 2025.
Is there other construction near 2639 Marburg St?
Yes. Nearby filings include 2627 Marburg St (nsfaa-new construction - sfh, Sep 22, 2026); 2622 Marburg St (install new system and new ducts, Feb 12, 2026); 2621 Marburg St (electrical raiser pipe repair, Nov 2, 2026).
How do I get alerts for new permits at 2639 Marburg St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 2627 Marburg StSep 22, 2026Nsfaa-new construction - sfh · 22 m away
- 2622 Marburg StFeb 12, 2026Install new system and new ducts · 32 m away
- 2621 Marburg StNov 2, 2026Electrical raiser pipe repair · 33 m away
- 2601 Marburg StApr 17, 2026The project requires removal and proper disposal of previous cedar fence. new fencing material will be added in the exact same place along the rear fence. the proposed side changes of the fence will be extended by 25 ft on the west side and 60 ft on the east side. the proposed new front fence will be built 6 ft high across the front of the residence in front property boundaries. all posts will be set in concrete approximately 6 ft a part, post side to face inward toward the property. the wood is 5/8-in x 5-1/8-in x 6-ft treated pine · 69 m away
- 2622 Carpenter AveMay 28, 2025Replace electrical meter box · 95 m away
- 2614 Carpenter AveSep 24, 2025House rewire and service panel · 100 m away
- 2638 Southland StMay 26, 2026New construction · 114 m away
- 2626 Southland StNov 29, 2025New construction · 116 m away
- 2650 Southland StJan 5, 2026Installation of hvac equipment, ductwork and startup · 116 m away
- 2701 Marburg StMar 22, 2026Installation of new hvac system · 122 m away
- 2731 Marburg StOct 9, 2025Install new hvac · 176 m away
- 2730 Marburg StJun 22, 2026Installation complete 3.5 tons · 176 m away