3514 Packard St
Dallas, TX 75215
3514 Packard St: 1 project on record
City of Dallas lists 1 filing across 1 project at 3514 Packard St, Dallas, TX 75215. The most recent, filed July 3, 2025, covers: “Homeowner remodel. no walls or windows being moved. so, no remodel permit needed according to the homeowner”.
Compiled from City of Dallas records · updated Jul 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 3, 2025
- since Jul 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectHomeowner remodel. no walls or windows being moved. so, no remodel permit needed according to the homeowner
Homeowner remodel. no walls or windows being moved. so, no remodel permit needed according to the homeowner
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 3514 Packard St
What is being built at 3514 Packard St?
The latest filing (City of Dallas permit RES-PLM-25-002082, July 3, 2025) covers homeowner remodel. no walls or windows being moved. so, no remodel permit needed according to the homeowner.
How many permits and filings does 3514 Packard St have?
1 filing across 1 project, from July 3, 2025 to July 3, 2025.
Is there other construction near 3514 Packard St?
Yes. Nearby filings include 3518 Packard St (electrical repairs, Oct 12, 2020); 3511 Packard St (new hvac system, ducts, boot, copper line set, thermostat wire, Sep 9, 2026); 3523 Packard St (upgrade existing electrical service, Oct 8, 2020).
How do I get alerts for new permits at 3514 Packard St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 3518 Packard StOct 12, 2020Electrical repairs · 5 m away
- 3511 Packard StSep 9, 2026New hvac system, ducts, boot, copper line set, thermostat wire · 14 m away
- 3523 Packard StOct 8, 2020Upgrade existing electrical service · 16 m away
- 3424 Kimble StNov 3, 2026Entire plumbing will be replaced, an extra bathroom will be added and island sink · 114 m away
- 2236 Cooper StJan 8, 2021Gas test · 114 m away
- 3419 Kimble StJul 21, 2026Installing prv and expansion tank · 119 m away
- 3410 Kimble StJul 1, 2025Reroof, remove existing shingle and replace with asphalt shingles · 129 m away
- 3419 Edgewood StDec 28, 2020Install electrical for new contruction or addition · 137 m away
- 2322 Cooper StAug 12, 2025Replace 3 ton complete gas system · 152 m away
- 3516 S Harwood StNov 13, 2025Installation of fixtures and testing top out per city and pass inspections to connect sewer to city. sewer not installed by us. just needing to connect · 154 m away
- 3512 S Harwood StSep 9, 2026New construction · 154 m away
- 3508 S Harwood StSep 25, 2026New construction _ residential · 154 m away