3523 Packard St
Dallas, TX 75215
3523 Packard St: 1 project on record
City of Dallas lists 1 filing across 1 project at 3523 Packard St, Dallas, TX 75215. The most recent, filed October 8, 2020, covers: “Upgrade existing electrical service”.
Compiled from City of Dallas records · updated Oct 8, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 8, 2020
- since Oct 8, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3523 Packard St
What is being built at 3523 Packard St?
The latest filing (City of Dallas permit 2010083056, October 8, 2020) covers upgrade existing electrical service.
How many permits and filings does 3523 Packard St have?
1 filing across 1 project, from October 8, 2020 to October 8, 2020.
Is there other construction near 3523 Packard St?
Yes. Nearby filings include 3518 Packard St (electrical repairs, Oct 12, 2020); 3511 Packard St (new hvac system, ducts, boot, copper line set, thermostat wire, Sep 9, 2026); 3514 Packard St (homeowner remodel. no walls or windows being moved. so, no remodel permit needed according to the homeowner, Jul 3, 2025).
How do I get alerts for new permits at 3523 Packard St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75215- 3518 Packard StOct 12, 2020Electrical repairs · 14 m away
- 3511 Packard StSep 9, 2026New hvac system, ducts, boot, copper line set, thermostat wire · 15 m away
- 3514 Packard StJul 3, 2025Homeowner remodel. no walls or windows being moved. so, no remodel permit needed according to the homeowner · 16 m away
- 2236 Cooper StJan 8, 2021Gas test · 107 m away
- 3424 Kimble StNov 3, 2026Entire plumbing will be replaced, an extra bathroom will be added and island sink · 126 m away
- 3419 Kimble StJul 21, 2026Installing prv and expansion tank · 130 m away
- 3410 Kimble StJul 1, 2025Reroof, remove existing shingle and replace with asphalt shingles · 141 m away
- 3516 S Harwood StNov 13, 2025Installation of fixtures and testing top out per city and pass inspections to connect sewer to city. sewer not installed by us. just needing to connect · 141 m away
- 3512 S Harwood StSep 9, 2026New construction · 142 m away
- 3508 S Harwood StSep 25, 2026New construction _ residential · 142 m away
- 3504 S Harwood StJun 30, 2026Installation of electrical wiring and devices for resident · 143 m away
- 3500 S Harwood StSep 17, 2026Install me for new construction · 144 m away