1618 S Ewing Ave
Dallas, TX 75216
Electrical permit at 1618 S Ewing Ave lists no work
A commercial electrical permit at 1618 S Ewing Ave lists “Cleaning show no work,” rather than a construction project. The City of Dallas permit, COM-ELC-26-001412, was filed on March 31, 2026.
Summarized from City of Dallas records · updated Mar 31, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 31, 2026
- since Mar 31, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1618 S Ewing Ave
What is being built at 1618 S Ewing Ave?
The City of Dallas permit does not describe new construction. Its description says “Cleaning show no work.”
What does the permit for 1618 S Ewing Ave cover?
It is a commercial electrical permit, COM-ELC-26-001412. The description says “Cleaning show no work.”
When was the permit filed for 1618 S Ewing Ave?
The permit was filed on March 31, 2026.
Is construction planned at 1618 S Ewing Ave?
The available permit record does not list construction work. It says “Cleaning show no work.”
What's happening at 1618 S Ewing Ave near Pathways Hub?
A commercial electrical permit was filed for the address on March 31, 2026. Its description says “Cleaning show no work.”
Also being built nearby
All of 75216- 1612 S Ewing AveSep 5, 2026No work being done electrical inspections only to get the power turned back on · 3 m away
- 1015 Vermont AveOct 22, 2020Gas test atmos · 47 m away
- 828 Stella AveDec 4, 2025Testing gas lines · 89 m away
- 832 Stella Ave · 832 StellaJun 29, 2026Install new temporary pole for cleaning and security lights and cameras · 107 m away
- 1545 S Ewing AveJan 21, 2026Dsst- cha-kipp texas es modify three existing gates to operate on new track system using existing material. install one new track gate on a new track system. installation of 280 linear ft of 8ft tall vinyl-coated chain link fencing. install three pedestrian gates. two will be 48in push-bar style with rfid key card and one will be 40in padlock style · 113 m away
- 1724 S Ewing AveOct 26, 2026Will paint and replace the boards on the exterior of the building. will renovate the inside of the building as well. i just bought the building. not sure what i will do with it · 113 m away
- 825 Vermont AveJun 24, 2026We are replacing the main sewer line behind the building · 144 m away
- 815 Vermont AveMay 22, 2026Demolish structure & remove debrisno protected trees will be removed or disturbed · 153 m away
- 1802 S Ewing AveJan 8, 2021Gas test · 165 m away
- 1805 Idaho AveMar 3, 2026Nsfaa-duplex 1805 idaho ave we are going to construct a new build duplex, with an office at the rear · 171 m away
- 1811 Idaho AveFeb 24, 2026New hvac system · 178 m away
- 1534 Harlandale AveMar 25, 2026Install service 200amps · 181 m away