825 Vermont Ave
Dallas, TX 75216
Sewer line replacement and permit updates at 825 Vermont
City of Dallas records show a commercial electrical service release permitted on November 25, 2025, and an as-built floor plan submission permitted on April 21, 2026. A June 24, 2026 plumbing permit covers replacement of the main sewer line behind the building.
Summarized from City of Dallas records · updated Jun 24, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jun 24, 2026
- since Nov 25, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsMcr this permit is being submitted in response to the the email received regarding co-26-000909. the email stated that changes had been made to the floor plan of the building that i was not aware of. an "as-built" floor plan has been completed and is being submitted
Mcr this permit is being submitted in response to the the email received regarding co-26-000909. the email stated that changes had been made to the floor plan of the building that i was not aware of. an "as-built" floor plan has been completed and is being submitted
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 825 Vermont Ave
What is happening at 825 Vermont Ave in Dallas?
Dallas permits show an electrical service release, an as-built floor plan submission, and replacement of the main sewer line behind the building. The latest filing is plumbing permit COM-PLM-26-002329, dated June 24, 2026.
Is the sewer line being replaced at 825 Vermont Ave?
Yes. A City of Dallas commercial plumbing permit dated June 24, 2026, describes replacing the main sewer line behind the building.
What does the April 2026 permit for 825 Vermont cover?
Commercial alteration permit COM-ALT-ADD-26-000693, filed April 21, 2026, submits an as-built floor plan in response to an email about changes to the building's floor plan.
When was electrical work permitted at 825 Vermont Ave?
A commercial electrical permit for a service release was filed on November 25, 2025. The permit number is COM-ELC-25-003379.
What's happening near Pathways Hub on Stella Avenue?
At 825 Vermont Ave, about 250 meters from Pathways Hub, a June 2026 permit covers replacement of the main sewer line behind the building. Dallas records also show an April 2026 as-built floor plan submission and a November 2025 electrical service release.
Also being built nearby
All of 75216- 815 Vermont AveMay 22, 2026Demolish structure & remove debrisno protected trees will be removed or disturbed · 10 m away
- 1806 Maryland AveSep 2, 20261806 maryland reset reshim 1277 sq ft to stabilize foundation · 121 m away
- 1811 Maryland AveDec 27, 2020Electrical repairs · 129 m away
- 1805 Idaho AveMar 3, 2026Nsfaa-duplex 1805 idaho ave we are going to construct a new build duplex, with an office at the rear · 141 m away
- 1618 S Ewing AveMar 31, 2026Cleaning show no work · 144 m away
- 1612 S Ewing AveSep 5, 2026No work being done electrical inspections only to get the power turned back on · 144 m away
- 1811 Idaho AveFeb 24, 2026New hvac system · 147 m away
- 1015 Vermont AveOct 22, 2020Gas test atmos · 153 m away
- 705 Iowa AveAug 18, 2025Replace 2 ton complete gas system · 162 m away
- 1735 S Marsalis AveSep 2, 2026Mcr with battery install a 14.800 kw roof mounted pv solar system, 37 panels and a tesla energy gateway, tesla powerwall utility controlled shutdown needed to install teg-3 between the utility meter and the mdp · 163 m away
- 719 Korgan StJan 5, 2026Gas test pressure · 165 m away
- 707 Korgan StDec 4, 2025Complete rewire of a 1500sq ft property with a service update · 172 m away