2620 Seevers Ave
Dallas, TX 75216
HVAC system and concrete right-of-way work at 2620 Seevers Ave
Residential permits at 2620 Seevers Ave cover a new concrete right-of-way pour and installation of a 4-ton HVAC system with ducts, grills and an exhaust fan. The concrete work was permitted June 11, 2025, under permit RES-DSW-25-000176; the HVAC work was permitted October 2, 2025, under permit RES-MEC-25-002923.
Summarized from City of Dallas records · updated Oct 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 2, 2025
- since Jun 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstallation of one(1) electrical hvac system 4 ton in the attic, some ducts, grills and exhaust fan
Installation of one(1) electrical hvac system 4 ton in the attic, some ducts, grills and exhaust fan
City of Dallas permitResidential Mechanical Permit
Sources: City of Dallas
Questions about 2620 Seevers Ave
What is being built at 2620 Seevers Ave in Dallas?
Dallas permit records show residential work for a new concrete right-of-way pour and installation of a 4-ton HVAC system with ducts, grills and an exhaust fan. The records do not describe a new home.
Is a new house being built at 2620 Seevers Ave?
The two permits listed for this address are for HVAC installation and concrete right-of-way work, not new-home construction.
When was the HVAC work permitted at 2620 Seevers Ave?
The HVAC permit, RES-MEC-25-002923, was filed October 2, 2025. It describes installation of a 4-ton system in the attic, with ducts, grills and an exhaust fan.
What does permit RES-DSW-25-000176 cover?
The City of Dallas permit dated June 11, 2025, is for pouring new concrete in the right of way. It is listed as a residential drive approach and sidewalk permit.
What work is permitted near Goldflix Auto Care on S. Beckley Ave?
At 2620 Seevers Ave, about 152 meters from Goldflix Auto Care, Dallas records show permits for a 4-ton HVAC system and a new concrete right-of-way pour.
Also being built nearby
All of 75216- 2618 Seevers AveDec 19, 2025Wire a new house · 4 m away
- 2624 Seevers AveAug 15, 2025New pv+battery system design13 modules - 4.810 kw dc, 3.770 kw ac system size · 8 m away
- 2627 Seevers AveJan 30, 2026Nsfaa this project consists of a residential remodel and addition. the existing house will be remodeled, with a new addition constructed at the rear. the scope of work includes mechanical, electrical, plumbing, framing, and foundation work. the existing garage will also be remodeled as part of this project · 17 m away
- 2631 Seevers AveDec 16, 2025Three fall on electrical service damage riser conduit and meter, we only replacing the riser conduit and the meter base · 23 m away
- 2638 Seevers AveFeb 26, 2026Hvac new build · 34 m away
- 2522 Seevers AveJun 7, 2023Residential new construction · 81 m away
- 2623 Ramsey AveNov 10, 2026Service upgrade · 99 m away
- 2601 Ramsey AveJan 28, 2026Demolition of existing 1-story sfh using a small excavator and dumped at mccommas bluff landfill · 106 m away
- 2615 S Beckley AveApr 7, 2026Gas pressure test · 129 m away
- 103 Terrace DrOct 27, 2026Service release no work · 138 m away
- 2510 Seevers AveNov 10, 2020Gas relay or repair with test · 150 m away
- 2643 S. Beckley Ave · Goldflix Auto CareMar 20, 2024Auto repair shop — new construction — this auto repair shop will be made prefrabicated metal structures, 6 steel roll-up doors in 8200 sq ft, including 2 story with offices, waiting room, front desk service area, lunchroom, 2 restrooms, 2 bathrooms and meeting room in 2480 sq ft · 152 m away