2615 S Beckley Ave
Dallas, TX 75224
Gas pressure tests filed at 2615 S Beckley Ave
City of Dallas records show two gas pressure-test permits at 2615 S Beckley Ave: a residential plumbing permit filed March 27, 2026, and a commercial plumbing permit filed April 7, 2026. The records do not identify a tenant or provide further project details.
Summarized from City of Dallas records · updated Apr 7, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 7, 2026
- since Mar 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2615 S Beckley Ave
What is happening at 2615 S Beckley Ave in Dallas?
City of Dallas records list two permits for gas pressure tests at the address, filed March 27 and April 7, 2026.
What permits were filed at 2615 S Beckley Ave?
The records show a residential plumbing permit, RES-PLM-26-003306, filed March 27, 2026, and a commercial plumbing permit, COM-PLM-26-001205, filed April 7, 2026. Both describe a gas pressure test.
When were the gas pressure-test permits filed at 2615 S Beckley Ave?
The residential plumbing permit was filed March 27, 2026. The commercial plumbing permit was filed April 7, 2026.
Is a new building planned at 2615 S Beckley Ave?
The available City of Dallas records describe gas pressure tests. They do not specify a new building or other construction project.
What business is going into 2615 S Beckley Ave?
The permit records do not name a business or tenant at the address.
Also being built nearby
All of 75224- 103 Terrace DrOct 27, 2026Service release no work · 20 m away
- 133 Terrace DrSep 15, 2025Repair approach and repair sidewalk · 56 m away
- 2643 S. Beckley Ave · Goldflix Auto CareMar 20, 2024Auto repair shop — new construction — this auto repair shop will be made prefrabicated metal structures, 6 steel roll-up doors in 8200 sq ft, including 2 story with offices, waiting room, front desk service area, lunchroom, 2 restrooms, 2 bathrooms and meeting room in 2480 sq ft · 56 m away
- 136 Terrace DrAug 21, 2025Install new plumbing two baths, kitchen, washer box, gas to stove · 67 m away
- 2631 Seevers AveDec 16, 2025Three fall on electrical service damage riser conduit and meter, we only replacing the riser conduit and the meter base · 113 m away
- 2627 Seevers AveJan 30, 2026Nsfaa this project consists of a residential remodel and addition. the existing house will be remodeled, with a new addition constructed at the rear. the scope of work includes mechanical, electrical, plumbing, framing, and foundation work. the existing garage will also be remodeled as part of this project · 114 m away
- 2638 Seevers AveFeb 26, 2026Hvac new build · 125 m away
- 133 W Hobson AveJan 13, 20264 access holes in dirt up to 8 feet of tunnel and 35 feet of trench in dirt needed to make repair for sewer system · 127 m away
- 2624 Seevers AveAug 15, 2025New pv+battery system design13 modules - 4.810 kw dc, 3.770 kw ac system size · 128 m away
- 2620 Seevers AveOct 2, 2025Installation of one(1) electrical hvac system 4 ton in the attic, some ducts, grills and exhaust fan · 129 m away
- 2618 Seevers AveDec 19, 2025Wire a new house · 130 m away
- 114 W Hobson AveJul 17, 2026Furnish and install a 232.46 kwdc rooftop photovoltaic (solar) system on the beckley saner recreation center building, including all associated electrical equipment, wiring, raceways, disconnecting means, monitoring, and interconnection to the existing 480y/277v electrical service. work includes:installation of 394 solar pv modules (znshine solar zxm7-uhldd144-590w) on roofs a1, a2, b, c, and e using sollega fastrack 510-6 ballasted racking at 10° tiltinstallation of (3) sol-ark 60k-3p-480v inverters on rooftop equipment rackinstallation of tigo ts4-a-2f module-level power electronics (mlpe)installation of new rooftop ac solar panelboard (480v, 3?, 4w, 400a, nema 3r)installation of new utility pv ac disconnect (480v, 3?, 4w, 400a, lockable, load-break rated, nema 3r)supply-side interconnection to existing 600a, 480v, 3? service at the automatic transfer switchinstallation of rapid shutdown system connected to master inverterinstallation of egauge eg4015 monitoring system with ct metering and das enclosureall dc and ac conductors, conduit, pull boxes, grounding, bonding, and labeling per nec 2020system to operate in parallel with oncor utility service under net meteringall work in accordance with nec/ 2020, ul 1703, ul 1741, ul 2703, and applicable local codes · 130 m away