133 Terrace Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 133 Terrace Dr, Dallas, TX 75224. The most recent, filed September 15, 2025, covers: “Repair approach and repair sidewalk”.
Compiled from City of Dallas records · updated Sep 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 15, 2025
- since Sep 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 133 Terrace Dr
What is being built at 133 Terrace Dr?
The latest filing (City of Dallas permit RES-DSW-25-000374, September 15, 2025) covers repair approach and repair sidewalk.
How many permits and filings does 133 Terrace Dr have?
1 filing across 1 project, from September 15, 2025 to September 15, 2025.
What is being built near Goldflix Auto Care in Dallas?
133 Terrace Dr is about 64 m from Goldflix Auto Care (2643 S. Beckley Ave). Its latest filing is for repair approach and repair sidewalk.
Is there other construction near 133 Terrace Dr?
Yes. Nearby filings include 136 Terrace Dr (install new plumbing two baths, kitchen, washer box, gas to stove, Aug 21, 2025); 103 Terrace Dr (service release no work, Oct 27, 2026); 2615 S Beckley Ave (gas pressure test, Apr 7, 2026).
How do I get alerts for new permits at 133 Terrace Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75224- 136 Terrace DrAug 21, 2025Install new plumbing two baths, kitchen, washer box, gas to stove · 14 m away
- 103 Terrace DrOct 27, 2026Service release no work · 49 m away
- 2615 S Beckley AveApr 7, 2026Gas pressure test · 56 m away
- 2643 S. Beckley Ave · Goldflix Auto CareMar 20, 2024Auto repair shop — new construction — this auto repair shop will be made prefrabicated metal structures, 6 steel roll-up doors in 8200 sq ft, including 2 story with offices, waiting room, front desk service area, lunchroom, 2 restrooms, 2 bathrooms and meeting room in 2480 sq ft · 64 m away
- 133 W Hobson AveJan 13, 20264 access holes in dirt up to 8 feet of tunnel and 35 feet of trench in dirt needed to make repair for sewer system · 96 m away
- 114 W Hobson AveJul 17, 2026Furnish and install a 232.46 kwdc rooftop photovoltaic (solar) system on the beckley saner recreation center building, including all associated electrical equipment, wiring, raceways, disconnecting means, monitoring, and interconnection to the existing 480y/277v electrical service. work includes:installation of 394 solar pv modules (znshine solar zxm7-uhldd144-590w) on roofs a1, a2, b, c, and e using sollega fastrack 510-6 ballasted racking at 10° tiltinstallation of (3) sol-ark 60k-3p-480v inverters on rooftop equipment rackinstallation of tigo ts4-a-2f module-level power electronics (mlpe)installation of new rooftop ac solar panelboard (480v, 3?, 4w, 400a, nema 3r)installation of new utility pv ac disconnect (480v, 3?, 4w, 400a, lockable, load-break rated, nema 3r)supply-side interconnection to existing 600a, 480v, 3? service at the automatic transfer switchinstallation of rapid shutdown system connected to master inverterinstallation of egauge eg4015 monitoring system with ct metering and das enclosureall dc and ac conductors, conduit, pull boxes, grounding, bonding, and labeling per nec 2020system to operate in parallel with oncor utility service under net meteringall work in accordance with nec/ 2020, ul 1703, ul 1741, ul 2703, and applicable local codes · 113 m away
- 132 W Elmore AveDec 8, 2025Nsfaadetached structure addition of 349 sq ft · 116 m away
- 136 W Elmore AveOct 28, 2020Replace or modify existing hvac · 127 m away
- 2716 S Beckley AveMar 17, 2026Qteam inhouse addition to existing restaurant · 155 m away
- 211 W Hobson AveNov 27, 2025Removing and replacing shingles · 159 m away
- 2631 Seevers AveDec 16, 2025Three fall on electrical service damage riser conduit and meter, we only replacing the riser conduit and the meter base · 168 m away
- 2627 Seevers AveJan 30, 2026Nsfaa this project consists of a residential remodel and addition. the existing house will be remodeled, with a new addition constructed at the rear. the scope of work includes mechanical, electrical, plumbing, framing, and foundation work. the existing garage will also be remodeled as part of this project · 170 m away