114 W Hobson Ave
Dallas, TX 75224
Rooftop solar permitted at Beckley Saner Recreation Center
A 232.46-kWdc rooftop solar system is planned for the Beckley Saner Recreation Center at 114 W Hobson Ave. A City of Dallas permit filed July 17, 2026, covers installation of 394 solar modules, inverters and related electrical equipment.
Summarized from City of Dallas records · updated Jul 17, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 17, 2026
- since Jul 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectFurnish and install a 232.46 kwdc rooftop photovoltaic (solar) system on the beckley saner recreation center building, including all associated electrical equipment, wiring, raceways, disconnecting means, monitoring, and interconnection to the existing 480y/277v electrical service. work includes:installation of 394 solar pv modules (znshine solar zxm7-uhldd144-590w) on roofs a1, a2, b, c, and e using sollega fastrack 510-6 ballasted racking at 10° tiltinstallation of (3) sol-ark 60k-3p-480v inverters on rooftop equipment rackinstallation of tigo ts4-a-2f module-level power electronics (mlpe)installation of new rooftop ac solar panelboard (480v, 3?, 4w, 400a, nema 3r)installation of new utility pv ac disconnect (480v, 3?, 4w, 400a, lockable, load-break rated, nema 3r)supply-side interconnection to existing 600a, 480v, 3? service at the automatic transfer switchinstallation of rapid shutdown system connected to master inverterinstallation of egauge eg4015 monitoring system with ct metering and das enclosureall dc and ac conductors, conduit, pull boxes, grounding, bonding, and labeling per nec 2020system to operate in parallel with oncor utility service under net meteringall work in accordance with nec/ 2020, ul 1703, ul 1741, ul 2703, and applicable local codes
Furnish and install a 232.46 kwdc rooftop photovoltaic (solar) system on the beckley saner recreation center building, including all associated electrical equipment, wiring, raceways, disconnecting means, monitoring, and interconnection to the existing 480y/277v electrical service. work includes:installation of 394 solar pv modules (znshine solar zxm7-uhldd144-590w) on roofs a1, a2, b, c, and e using sollega fastrack 510-6 ballasted racking at 10° tiltinstallation of (3) sol-ark 60k-3p-480v inverters on rooftop equipment rackinstallation of tigo ts4-a-2f module-level power electronics (mlpe)installation of new rooftop ac solar panelboard (480v, 3?, 4w, 400a, nema 3r)installation of new utility pv ac disconnect (480v, 3?, 4w, 400a, lockable, load-break rated, nema 3r)supply-side interconnection to existing 600a, 480v, 3? service at the automatic transfer switchinstallation of rapid shutdown system connected to master inverterinstallation of egauge eg4015 monitoring system with ct metering and das enclosureall dc and ac conductors, conduit, pull boxes, grounding, bonding, and labeling per nec 2020system to operate in parallel with oncor utility service under net meteringall work in accordance with nec/ 2020, ul 1703, ul 1741, ul 2703, and applicable local codes
City of Dallas permitCommercial Solar/PV Permit
Sources: City of Dallas
Questions about 114 W Hobson Ave
What is being built at 114 W Hobson Ave in Dallas?
A City of Dallas permit indicates a 232.46-kWdc rooftop solar system is planned for the Beckley Saner Recreation Center. The permit covers 394 solar modules and associated electrical equipment.
Is a solar installation planned at Beckley Saner Recreation Center?
Yes. Permit COM-SOLAR-26-000007, filed July 17, 2026, covers a rooftop photovoltaic system at the recreation center.
How large is the solar system at 114 W Hobson Ave?
The permit describes a 232.46-kWdc rooftop solar system with 394 photovoltaic modules.
When was the solar permit filed for 114 W Hobson Ave?
The City of Dallas permit was filed July 17, 2026. Its permit number is COM-SOLAR-26-000007.
Will the solar system connect to the utility grid?
The permit describes a system designed to operate in parallel with Oncor utility service under net metering.
What equipment is included in the Beckley Saner Recreation Center solar permit?
The work includes 394 rooftop solar modules, three inverters, monitoring equipment, electrical panels, disconnects and wiring.
Also being built nearby
All of 75224- 133 W Hobson AveJan 13, 20264 access holes in dirt up to 8 feet of tunnel and 35 feet of trench in dirt needed to make repair for sewer system · 32 m away
- 2716 S Beckley AveMar 17, 2026Qteam inhouse addition to existing restaurant · 48 m away
- 2643 S. Beckley Ave · Goldflix Auto CareMar 20, 2024Auto repair shop — new construction — this auto repair shop will be made prefrabicated metal structures, 6 steel roll-up doors in 8200 sq ft, including 2 story with offices, waiting room, front desk service area, lunchroom, 2 restrooms, 2 bathrooms and meeting room in 2480 sq ft · 76 m away
- 136 Terrace DrAug 21, 2025Install new plumbing two baths, kitchen, washer box, gas to stove · 103 m away
- 103 Terrace DrOct 27, 2026Service release no work · 111 m away
- 133 Terrace DrSep 15, 2025Repair approach and repair sidewalk · 113 m away
- 2615 S Beckley AveApr 7, 2026Gas pressure test · 130 m away
- 2719 Seevers AveDec 4, 2020Install electrical for new contruction or addition · 139 m away
- 2728 Seevers AveNov 7, 2020Gas relay or repair with test · 157 m away
- 211 W Hobson AveNov 27, 2025Removing and replacing shingles · 157 m away
- 2736 Seevers AveDec 29, 2025Gas test · 164 m away
- 2638 Seevers AveFeb 26, 2026Hvac new build · 194 m away
More solar installs in 75224.