2728 Seevers Ave
Dallas, TX 75216
2728 Seevers Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 2728 Seevers Ave, Dallas, TX 75216. The most recent, filed November 7, 2020, covers: “Gas relay or repair with test”.
Compiled from City of Dallas records · updated Nov 7, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 7, 2020
- since Nov 7, 2020
- Largest scope
- —
- Listed value
- $35
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 2728 Seevers Ave
What is being built at 2728 Seevers Ave?
The latest filing (City of Dallas permit 2011073005, November 7, 2020) covers gas relay or repair with test.
How many permits and filings does 2728 Seevers Ave have?
1 filing across 1 project, from November 7, 2020 to November 7, 2020.
How much is the construction at 2728 Seevers Ave worth?
Permits at this address list about $35 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Goldflix Auto Care in Dallas?
2728 Seevers Ave is about 179 m from Goldflix Auto Care (2643 S. Beckley Ave). Its latest filing is for gas relay or repair with test.
Is there other construction near 2728 Seevers Ave?
Yes. Nearby filings include 2736 Seevers Ave (gas test, Dec 29, 2025); 2719 Seevers Ave (install electrical for new contruction or addition, Dec 4, 2020); 2717 Ramsey Ave (gas relay or repair with test, Nov 5, 2020).
How do I get alerts for new permits at 2728 Seevers Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75216- 2736 Seevers AveDec 29, 2025Gas test · 16 m away
- 2719 Seevers AveDec 4, 2020Install electrical for new contruction or addition · 24 m away
- 2717 Ramsey AveNov 5, 2020Gas relay or repair with test · 102 m away
- 2716 S Beckley AveMar 17, 2026Qteam inhouse addition to existing restaurant · 114 m away
- 2716 Ramsey AveFeb 5, 2026Need a standalone water permit for the address. house was built in 2024 and the sewer inspection didn't either get done or put into system as passed. now the house is being sold and needing this permit to have a bonded camera company to run camera for the inspection · 115 m away
- 114 W Hobson AveJul 17, 2026Furnish and install a 232.46 kwdc rooftop photovoltaic (solar) system on the beckley saner recreation center building, including all associated electrical equipment, wiring, raceways, disconnecting means, monitoring, and interconnection to the existing 480y/277v electrical service. work includes:installation of 394 solar pv modules (znshine solar zxm7-uhldd144-590w) on roofs a1, a2, b, c, and e using sollega fastrack 510-6 ballasted racking at 10° tiltinstallation of (3) sol-ark 60k-3p-480v inverters on rooftop equipment rackinstallation of tigo ts4-a-2f module-level power electronics (mlpe)installation of new rooftop ac solar panelboard (480v, 3?, 4w, 400a, nema 3r)installation of new utility pv ac disconnect (480v, 3?, 4w, 400a, lockable, load-break rated, nema 3r)supply-side interconnection to existing 600a, 480v, 3? service at the automatic transfer switchinstallation of rapid shutdown system connected to master inverterinstallation of egauge eg4015 monitoring system with ct metering and das enclosureall dc and ac conductors, conduit, pull boxes, grounding, bonding, and labeling per nec 2020system to operate in parallel with oncor utility service under net meteringall work in accordance with nec/ 2020, ul 1703, ul 1741, ul 2703, and applicable local codes · 157 m away
- 105 E Saner AveDec 14, 2025Replace 50 gal grease trap · 177 m away
- 2643 S. Beckley Ave · Goldflix Auto CareMar 20, 2024Auto repair shop — new construction — this auto repair shop will be made prefrabicated metal structures, 6 steel roll-up doors in 8200 sq ft, including 2 story with offices, waiting room, front desk service area, lunchroom, 2 restrooms, 2 bathrooms and meeting room in 2480 sq ft · 179 m away
- 118 E Saner AveOct 31, 2025Relocate main building drain outside of building to city new cleanout tab · 179 m away
- 2638 Seevers AveFeb 26, 2026Hvac new build · 181 m away
- 133 W Hobson AveJan 13, 20264 access holes in dirt up to 8 feet of tunnel and 35 feet of trench in dirt needed to make repair for sewer system · 189 m away
- 104 E Saner AveNov 18, 2026New electrical service for new city of dallas traffic signal on txdot project stp 2025(182) vru, etc · 192 m away