2732 Modree Ave
Dallas, TX 75216
2732 Modree Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 2732 Modree Ave, Dallas, TX 75216. The most recent, filed June 23, 2025, covers: “Replace 3 ton complete gas system”.
Compiled from City of Dallas records · updated Jun 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 23, 2025
- since Jun 23, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2732 Modree Ave
What is being built at 2732 Modree Ave?
The latest filing (City of Dallas permit RES-MEC-25-000769, June 23, 2025) covers replace 3 ton complete gas system.
How many permits and filings does 2732 Modree Ave have?
1 filing across 1 project, from June 23, 2025 to June 23, 2025.
Is there other construction near 2732 Modree Ave?
Yes. Nearby filings include 2727 Modree Ave (replace 2 ton complete heat pump, May 27, 2025); 2723 Modree Ave (service repair only, Jun 3, 2026); 2829 Marjorie Ave (gas service, Oct 24, 2026).
How do I get alerts for new permits at 2732 Modree Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75216- 2727 Modree AveMay 27, 2025Replace 2 ton complete heat pump · 19 m away
- 2723 Modree AveJun 3, 2026Service repair only · 26 m away
- 2829 Marjorie AveOct 24, 2026Gas service · 84 m away
- 4655 Cl Veasey BlvdDec 12, 2025Gas test only · 100 m away
- 2842 Marjorie AveAug 6, 2025Rpelacing 2.5 ton gas hvac system · 104 m away
- 2855 Marjorie AveSep 17, 2026House has been vacant for over 6 months and needs a gas test · 110 m away
- 2726 Kilburn AveSep 28, 2026Replace complete gas system · 115 m away
- 2859 Marjorie AveDec 1, 2025Gas test · 118 m away
- 2742 Marjorie AveFeb 3, 2026Installation of a battery back up system to an existing solar system, 3rd party reviewed plan set · 233 m away
- 2736 Marjorie AveNov 24, 2025212 feet of 8' tall cedar wooden fencing. includes digging posts 3' deep, encased in maximizer concrete, posts spaced 6' apart. posts will be 11' steel posts (only 8' above ground). pickets are done vertically, board on board, and they will be 1"x6"x8' pre-stained a dark walnut color. includes 1x4 pre stained trim. includes treated 2x6 kickboard along the fence line. includes steel post caps. includes 1 walk gate at 36" wide. this fence will be along the perimeter of his property line.the linear footage for the shared fence is 251'. this footage is divided between the two homeowners, ernesto flores and daniel wynn, and is used to calculate a total of 212' for this project and 445' respectively for daniel · 245 m away
- 4831 Sunnyvale StOct 5, 2025Removing old brick on the side and back, and installing new brick on the sides and back and installing new fascial and soffit · 253 m away
- 2651 Ann Arbor AveSep 25, 2025Gas test · 272 m away