2842 Marjorie Ave
Dallas, TX 75216
2842 Marjorie Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 2842 Marjorie Ave, Dallas, TX 75216. The most recent, filed August 6, 2025, covers: “Rpelacing 2.5 ton gas hvac system”.
Compiled from City of Dallas records · updated Aug 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 6, 2025
- since Aug 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2842 Marjorie Ave
What is being built at 2842 Marjorie Ave?
The latest filing (City of Dallas permit RES-MEC-25-001720, August 6, 2025) covers rpelacing 2.5 ton gas hvac system.
How many permits and filings does 2842 Marjorie Ave have?
1 filing across 1 project, from August 6, 2025 to August 6, 2025.
Is there other construction near 2842 Marjorie Ave?
Yes. Nearby filings include 2855 Marjorie Ave (house has been vacant for over 6 months and needs a gas test, Sep 17, 2026); 2829 Marjorie Ave (gas service, Oct 24, 2026); 2859 Marjorie Ave (gas test, Dec 1, 2025).
How do I get alerts for new permits at 2842 Marjorie Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75216- 2855 Marjorie AveSep 17, 2026House has been vacant for over 6 months and needs a gas test · 35 m away
- 2829 Marjorie AveOct 24, 2026Gas service · 40 m away
- 2859 Marjorie AveDec 1, 2025Gas test · 45 m away
- 2732 Modree AveJun 23, 2025Replace 3 ton complete gas system · 104 m away
- 2727 Modree AveMay 27, 2025Replace 2 ton complete heat pump · 120 m away
- 2723 Modree AveJun 3, 2026Service repair only · 123 m away
- 4655 Cl Veasey BlvdDec 12, 2025Gas test only · 136 m away
- 4831 Sunnyvale StOct 5, 2025Removing old brick on the side and back, and installing new brick on the sides and back and installing new fascial and soffit · 167 m away
- 2726 Kilburn AveSep 28, 2026Replace complete gas system · 209 m away
- 2742 Marjorie AveFeb 3, 2026Installation of a battery back up system to an existing solar system, 3rd party reviewed plan set · 251 m away
- 2736 Marjorie AveNov 24, 2025212 feet of 8' tall cedar wooden fencing. includes digging posts 3' deep, encased in maximizer concrete, posts spaced 6' apart. posts will be 11' steel posts (only 8' above ground). pickets are done vertically, board on board, and they will be 1"x6"x8' pre-stained a dark walnut color. includes 1x4 pre stained trim. includes treated 2x6 kickboard along the fence line. includes steel post caps. includes 1 walk gate at 36" wide. this fence will be along the perimeter of his property line.the linear footage for the shared fence is 251'. this footage is divided between the two homeowners, ernesto flores and daniel wynn, and is used to calculate a total of 212' for this project and 445' respectively for daniel · 264 m away
- 2915 Cummings StAug 6, 2026Gas test · 267 m away