3011 Ramsey Ave
Dallas, TX 75216
3011 Ramsey Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 3011 Ramsey Ave, Dallas, TX 75216. The most recent, filed November 20, 2020, covers: “Gas relay or repair with test”.
Compiled from City of Dallas records · updated Nov 20, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 20, 2020
- since Nov 20, 2020
- Largest scope
- —
- Listed value
- $85
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 3011 Ramsey Ave
What is being built at 3011 Ramsey Ave?
The latest filing (City of Dallas permit 2011203036, November 20, 2020) covers gas relay or repair with test.
How many permits and filings does 3011 Ramsey Ave have?
1 filing across 1 project, from November 20, 2020 to November 20, 2020.
How much is the construction at 3011 Ramsey Ave worth?
Permits at this address list about $85 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 3011 Ramsey Ave?
Yes. Nearby filings include 3031 Ramsey Ave (gas relay or repair with test, Oct 5, 2020); 3039 Ramsey Ave (new a/c, Jan 16, 2026); 3043 Ramsey Ave (gas relay or repair with test, Oct 5, 2020).
How do I get alerts for new permits at 3011 Ramsey Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75216- 3031 Ramsey AveOct 5, 2020Gas relay or repair with test · 44 m away
- 3039 Ramsey AveJan 16, 2026New a/c · 61 m away
- 3043 Ramsey AveOct 5, 2020Gas relay or repair with test · 70 m away
- 3006 Seevers AveNov 24, 2020Gas test · 100 m away
- 3018 Seevers AveMay 13, 2026Replace vented wall furnace · 101 m away
- 3015 Seevers AveJul 31, 2025Gas test · 113 m away
- 3023 Alabama AveNov 10, 2020Upgrade existing electrical service · 114 m away
- 3027 Seevers AveMar 21, 2026Replace interior hot and cold water lines with uonor pex pipe. replace cast iron drainpipe system under home with schedule 40 pvc. 4. sink, toilet and shower verticals are direct drops, 5. install new angle stops and ss braided supply lines to existing fixtures. 6. ensure stub outs are rigid, or cabinet mounted angle stops are strapped. 7. connect hot and cold to existing master fixtures. 8. install new 3” pvc and flange for toilet. 9. install new 2” pvc for sink’s shower. 10. install new 2” pvc for tub · 118 m away
- 3006 Alabama AveAug 28, 2026Natural gas line repair · 124 m away
- 3055 Seevers AveApr 20, 2026New bathroom addition toilet and sink · 149 m away
- 2934 Ramsey AveSep 23, 2026Mcr install 27 panels roof mounted pv solar system · 156 m away
- 2931 Ramsey AveNov 25, 2020Gas relay or repair with test · 163 m away