3015 Seevers Ave
Dallas, TX 75216
3015 Seevers Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 3015 Seevers Ave, Dallas, TX 75216. The most recent, filed July 31, 2025, covers: “Gas test”.
Compiled from City of Dallas records · updated Jul 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 31, 2025
- since Jul 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 3015 Seevers Ave
What is being built at 3015 Seevers Ave?
The latest filing (City of Dallas permit RES-PLM-25-003149, July 31, 2025) covers gas test.
How many permits and filings does 3015 Seevers Ave have?
1 filing across 1 project, from July 31, 2025 to July 31, 2025.
What is being built near Dallas ISD in Dallas?
3015 Seevers Ave is about 115 m from Dallas ISD (3031 S. Beckley Ave). Its latest filing is for gas test.
Is there other construction near 3015 Seevers Ave?
Yes. Nearby filings include 3018 Seevers Ave (replace vented wall furnace, May 13, 2026); 3006 Seevers Ave (gas test, Nov 24, 2020); 3027 Seevers Ave (replace interior hot and cold water lines with uonor pex pipe. replace cast iron drainpipe system under home with schedule 40 pvc. 4. sink, toilet and shower verticals are direct drops, 5. install new angle stops and ss braided supply lines to existing fixtures. 6. ensure stub outs are rigid, or cabinet mounted angle stops are strapped. 7. connect hot and cold to existing master fixtures. 8. install new 3” pvc and flange for toilet. 9. install new 2” pvc for sink’s shower. 10. install new 2” pvc for tub, Mar 21, 2026).
How do I get alerts for new permits at 3015 Seevers Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75216- 3018 Seevers AveMay 13, 2026Replace vented wall furnace · 15 m away
- 3006 Seevers AveNov 24, 2020Gas test · 22 m away
- 3027 Seevers AveMar 21, 2026Replace interior hot and cold water lines with uonor pex pipe. replace cast iron drainpipe system under home with schedule 40 pvc. 4. sink, toilet and shower verticals are direct drops, 5. install new angle stops and ss braided supply lines to existing fixtures. 6. ensure stub outs are rigid, or cabinet mounted angle stops are strapped. 7. connect hot and cold to existing master fixtures. 8. install new 3” pvc and flange for toilet. 9. install new 2” pvc for sink’s shower. 10. install new 2” pvc for tub · 26 m away
- 3055 Seevers AveApr 20, 2026New bathroom addition toilet and sink · 87 m away
- 3022 S Beckley AveNov 3, 2020Gas test with repairs · 98 m away
- 3011 Ramsey AveNov 20, 2020Gas relay or repair with test · 113 m away
- 3031 S. Beckley Ave · Dallas ISDMay 7, 2024Clinton p russell es - renovation — renovation/alteration — interior renovation, new entry vestibule, new roof, sidewalk replacement and new marquee sign · 115 m away
- 3031 Ramsey AveOct 5, 2020Gas relay or repair with test · 117 m away
- 3039 Ramsey AveJan 16, 2026New a/c · 123 m away
- 3043 Ramsey AveOct 5, 2020Gas relay or repair with test · 127 m away
- 3054 S Beckley AveMar 9, 2026Electrical repairs on meter · 130 m away
- 2942 S Beckley AveDec 9, 2020Gas test · 149 m away