3031 S. Beckley Ave
Dallas, TX 75224 · Dallas ISD
Clinton P Russell ES renovation registered in Dallas
A renovation at Clinton P Russell ES at 3031 S. Beckley Ave includes interior work, a new entry vestibule and roof, sidewalk replacement, and a new marquee sign. The project was registered with TDLR on May 7, 2024, with an estimated project cost of $3,026,626.
Summarized from Texas Department of Licensing and Regulation records · updated May 7, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 7, 2024
- since May 7, 2024
- Largest scope
- 134,337 sf
- Estimated cost
- $3.0M
- state registration
Where this project stands
Finishing up · inspection nextClinton P Russell ES - Renovation
134,337 sq ft · $3.0M est.
- RegisteredMay 7, 2024
- Plan review
- ConstructionAug '24 – Aug '25
- Inspectednow
- Closed
Scheduled to finish Aug 1, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectInterior renovation, new entry vestibule, new roof, sidewalk replacement and new marquee sign. — clinton p russell es
TDLR project registrationRenovation/AlterationReview Complete134,337 sq ft$3.0M est.- Project #
- TABS2024017916
- Tenant / owner
- Clinton P Russell Es - Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3031 S. Beckley Ave
What is being renovated at 3031 S. Beckley Ave in Dallas?
The TDLR registration describes a renovation at Clinton P Russell ES, including interior work, a new entry vestibule and roof, sidewalk replacement, and a new marquee sign.
When was the Clinton P Russell ES renovation registered?
The project was registered with TDLR on May 7, 2024. Its registration number is TABS2024017916.
How large is the Clinton P Russell ES renovation?
The TDLR registration lists the project at 134,337 square feet.
How much is the Clinton P Russell ES renovation expected to cost?
The applicant's TDLR estimate for the project is $3,026,626. This is an estimate, not a confirmed final cost.
What work is included in the Clinton P Russell ES renovation?
The registration lists interior renovation, a new entry vestibule, a new roof, sidewalk replacement, and a new marquee sign.
Who is associated with the renovation at 3031 S. Beckley Ave?
The fact sheet identifies Dallas ISD as the occupant or owner associated with the Clinton P Russell ES renovation.
What is the status of the Clinton P Russell ES project registration?
The TDLR record lists the status as “Review Complete.”
Also being built nearby
All of 75224- 3022 S Beckley AveNov 3, 2020Gas test with repairs · 22 m away
- 3054 S Beckley AveMar 9, 2026Electrical repairs on meter · 54 m away
- 3027 Seevers AveMar 21, 2026Replace interior hot and cold water lines with uonor pex pipe. replace cast iron drainpipe system under home with schedule 40 pvc. 4. sink, toilet and shower verticals are direct drops, 5. install new angle stops and ss braided supply lines to existing fixtures. 6. ensure stub outs are rigid, or cabinet mounted angle stops are strapped. 7. connect hot and cold to existing master fixtures. 8. install new 3” pvc and flange for toilet. 9. install new 2” pvc for sink’s shower. 10. install new 2” pvc for tub · 110 m away
- 3015 Seevers AveJul 31, 2025Gas test · 115 m away
- 3055 Seevers AveApr 20, 2026New bathroom addition toilet and sink · 122 m away
- 3018 Seevers AveMay 13, 2026Replace vented wall furnace · 125 m away
- 3006 Seevers AveNov 24, 2020Gas test · 133 m away
- 2942 S Beckley AveDec 9, 2020Gas test · 146 m away
- 122 Halsey StMay 11, 2026Gas meter reconnection. the gas company requires a gas test · 171 m away
- 130 Halsey StFeb 25, 2026Gas meter pipe inspection · 173 m away
- 211 Brodie StMay 20, 2026Service repair · 191 m away
- 226 Brodie StOct 28, 2025Electrical vehicle charger installation · 213 m away