4520 Hedgdon Dr
Dallas, TX 75216
Permit filed to replace a 3-ton HVAC system
A residential mechanical permit indicates one 3-ton system is being replaced at 4520 Hedgdon Dr. The City of Dallas permit was filed April 10, 2026, under permit RES-MEC-26-001612.
Summarized from City of Dallas records · updated Apr 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 10, 2026
- since Apr 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4520 Hedgdon Dr
What is happening at 4520 Hedgdon Dr?
A City of Dallas residential mechanical permit indicates replacement of one 3-ton system. The permit, RES-MEC-26-001612, was filed April 10, 2026.
Is a new house being built at 4520 Hedgdon Dr?
The available permit is for replacing one 3-ton system, not for new home construction.
What does the permit at 4520 Hedgdon Dr cover?
It covers replacement of one 3-ton system, according to City of Dallas permit RES-MEC-26-001612.
When was the 4520 Hedgdon Dr permit filed?
The City of Dallas filed the residential mechanical permit on April 10, 2026.
How many HVAC systems are being replaced at 4520 Hedgdon Dr?
The permit description specifies replacement of one 3-ton system.
Also being built nearby
All of 75216- 4533 Hedgdon DrJul 13, 2026New meter and riser new main disconnect · 32 m away
- 4509 Vandervort DrJun 25, 2025Move electrical service and make it underground feed · 142 m away
- 3212 Mallory DrJul 1, 2026Electrical work for new house · 144 m away
- 4509 Humphrey DrNov 18, 2025Scope of work:to restore safety and code compliance, we will perform the following:1. install new 200a outdoor service panelinstall a brand-new eaton ch 200-amp outdoor main breaker panel on the exterior of the home.this eliminates the unsafe indoor panel location and brings the service up to code.2. replace meter baseinstall a new meter base at the correct height as required by the utility provider.remove the existing high-mounted meter and unsafe mast installation.3. rebuild & secure the service mastrun new conduit from the meter base up through the roof.install proper roof flashing/roof boot to create a fully waterproof seal.secure the service mast to solid framing so storms or wind cannot pull it down.4. install grounding systeminstall two new 8-foot ground rods, spaced 6 feet apart (nec 250.53(a)(3)).run a new #4 bare copper grounding electrode conductor to the cold-water bond (nec 250.104(a)).this ensures proper grounding and reduces fire and shock risk.5. add whole-home surge protectioninstall a surge protector directly in the new outdoor panel to protect the home against power surges, lightning, and grid disturbances (nec 285).6. convert existing indoor closet panel into a junction boxthe current indoor panel will be converted into a junction box, since panels cannot remain active inside a closet (nec 240.24(d)).penetrate through the wall from the existing panel location to the new outdoor panel and run new conductors from the old circuits to the new service equipment · 162 m away
- 4539 Humphrey DrNov 9, 2026Gas relay and gas test · 176 m away
- 3444 Mallory DrNov 30, 2025Electrical service release no work · 200 m away
- 4444 Vandervort DrFeb 4, 2026Need city release to reconnect power · 203 m away
- 4513 Kolloch DrSep 9, 2026Installation of new central air conditioning system · 255 m away
- 4522 Kolloch DrDec 29, 20253.5 ton electric complete system · 270 m away
- 4526 Kolloch DrDec 29, 20253.5 ton electric complete system · 271 m away
- 4530 Kolloch DrOct 18, 20263.5 ton electric hvac systemrun ductwork · 272 m away
- 4536 Kolloch DrOct 18, 20263.5 ton electric hvac systemrun ductwork · 275 m away