Electrical service work permitted at 4533 Hedgdon Dr
A residential electrical permit at 4533 Hedgdon Dr covers a new meter and riser and a new main disconnect. The City of Dallas permit, RES-ELC-26-004108, was filed on July 13, 2026. The record does not describe broader construction.
Summarized from City of Dallas records · updated Jul 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 13, 2026
- since Jul 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4533 Hedgdon Dr
What work is planned at 4533 Hedgdon Dr?
The City of Dallas permit describes a new meter and riser and a new main disconnect. It is listed as a residential electrical permit.
When was the permit filed for 4533 Hedgdon Dr?
The permit was filed on July 13, 2026. Its number is RES-ELC-26-004108.
Is a new house being built at 4533 Hedgdon Dr?
The available permit record describes electrical service work, not construction of a new house.
Is a new business opening at 4533 Hedgdon Dr?
The record is for residential electrical work and does not identify a business or tenant.
What does permit RES-ELC-26-004108 cover?
The City of Dallas permit covers a new meter and riser and a new main disconnect at 4533 Hedgdon Dr. It was filed July 13, 2026.
Also being built nearby
All of 75216- 4520 Hedgdon DrApr 10, 2026Replacing one 3 ton system · 32 m away
- 3212 Mallory DrJul 1, 2026Electrical work for new house · 149 m away
- 4539 Humphrey DrNov 9, 2026Gas relay and gas test · 154 m away
- 4509 Humphrey DrNov 18, 2025Scope of work:to restore safety and code compliance, we will perform the following:1. install new 200a outdoor service panelinstall a brand-new eaton ch 200-amp outdoor main breaker panel on the exterior of the home.this eliminates the unsafe indoor panel location and brings the service up to code.2. replace meter baseinstall a new meter base at the correct height as required by the utility provider.remove the existing high-mounted meter and unsafe mast installation.3. rebuild & secure the service mastrun new conduit from the meter base up through the roof.install proper roof flashing/roof boot to create a fully waterproof seal.secure the service mast to solid framing so storms or wind cannot pull it down.4. install grounding systeminstall two new 8-foot ground rods, spaced 6 feet apart (nec 250.53(a)(3)).run a new #4 bare copper grounding electrode conductor to the cold-water bond (nec 250.104(a)).this ensures proper grounding and reduces fire and shock risk.5. add whole-home surge protectioninstall a surge protector directly in the new outdoor panel to protect the home against power surges, lightning, and grid disturbances (nec 285).6. convert existing indoor closet panel into a junction boxthe current indoor panel will be converted into a junction box, since panels cannot remain active inside a closet (nec 240.24(d)).penetrate through the wall from the existing panel location to the new outdoor panel and run new conductors from the old circuits to the new service equipment · 159 m away
- 4509 Vandervort DrJun 25, 2025Move electrical service and make it underground feed · 159 m away
- 3444 Mallory DrNov 30, 2025Electrical service release no work · 217 m away
- 4444 Vandervort DrFeb 4, 2026Need city release to reconnect power · 231 m away
- 4513 Kolloch DrSep 9, 2026Installation of new central air conditioning system · 268 m away
- 4522 Kolloch DrDec 29, 20253.5 ton electric complete system · 280 m away
- 4526 Kolloch DrDec 29, 20253.5 ton electric complete system · 280 m away
- 4530 Kolloch DrOct 18, 20263.5 ton electric hvac systemrun ductwork · 281 m away