1739 S St Augustine Dr
Dallas, TX 75217
EV charging infrastructure permitted at existing gas station
Permits indicate that electric vehicle charging infrastructure is planned at the existing gas station at 1739 S St Augustine Dr in Dallas. The City of Dallas filed permits on April 15 and April 24, 2026; the records do not specify the number of chargers.
Summarized from City of Dallas records · updated Apr 24, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 24, 2026
- since Apr 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsThe proposed scope of work is for the installation of electric vehicle (ev) charging infrastructure at an existing gas station. the objective is to integrate ev charging capabilities while maintaining safe and continuous operation of the facility
The proposed scope of work is for the installation of electric vehicle (ev) charging infrastructure at an existing gas station. the objective is to integrate ev charging capabilities while maintaining safe and continuous operation of the facility
City of Dallas permitCommercial Electrical PermitZo bc the proposed scope of work is for the installation of electric vehicle (ev) charging infrastructure at the existing gas station located at [site address or name]. the objective is to integrate ev charging capabilities while maintaining safe and continuous operation of the facility
Zo bc the proposed scope of work is for the installation of electric vehicle (ev) charging infrastructure at the existing gas station located at [site address or name]. the objective is to integrate ev charging capabilities while maintaining safe and continuous operation of the facility
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 1739 S St Augustine Dr
What is being built at 1739 S St Augustine Dr?
City of Dallas permits indicate that EV charging infrastructure is planned at the existing gas station. The records do not list the number of chargers.
Is a new gas station being built at 1739 S St Augustine Dr?
The permits describe EV charging infrastructure at an existing gas station, not construction of a new gas station.
When were the EV charging permits filed?
The City of Dallas filed a commercial alteration addition permit on April 15, 2026, and a commercial electrical permit on April 24, 2026.
What are the permit numbers for the project at 1739 S St Augustine Dr?
The permits are COM-ALT-ADD-26-000653, filed April 15, 2026, and COM-ELC-26-001786, filed April 24, 2026.
How many EV chargers are planned at 1739 S St Augustine Dr?
The permit descriptions refer to EV charging infrastructure but do not specify how many chargers are planned.
When will the EV chargers be available at 1739 S St Augustine Dr?
The permit records do not provide a construction schedule or an opening date for the charging infrastructure.
Also being built nearby
All of 75217- 1821 S St Augustine Dr · Auto Services CenterAug 3, 2026Renew meter base to 300 amps · 135 m away
- 9722 Oakwood DrAug 17, 2026Roof replacement. tearing down to decking and istalling new roofing system. no plywood replacement needed · 191 m away
- 9519 Timberloam DrJan 28, 2021Interior remodel only · 205 m away
- 1612 S St Augustine DrAug 11, 2025We will add 2 walls of commercial glass with aluminum frames and a door to close a small space · 277 m away
- 9480 Sandyland BlvdDec 4, 2025New construction · 290 m away
- 9470 Sandyland BlvdNov 18, 2025New construction · 317 m away
- 9450 Sandyland BlvdJan 22, 2026Install new 200a electrical panel. wire garage with new branch circuits, lighting and 240v receptacles · 373 m away
- 1630 Canary Island CtOct 19, 2026Nsfaa inspect the existing patio room · 410 m away
- 9607 Jo Pierce DrJan 22, 2021Construct new sfd · 415 m away
- 1625 Canary Island CtFeb 3, 2026Replace mater base · 423 m away
- 9656 Brierwood LnSep 23, 2020Electrical repairs · 426 m away
- 9634 Jo Pierce DrNov 16, 2020Gas test · 434 m away