EV charging infrastructure permitted at existing gas station

Permits indicate that electric vehicle charging infrastructure is planned at the existing gas station at 1739 S St Augustine Dr in Dallas. The City of Dallas filed permits on April 15 and April 24, 2026; the records do not specify the number of chargers.

Summarized from City of Dallas records · updated Apr 24, 2026

Projects
2
2 filings
Latest filing
Apr 24, 2026
since Apr 15, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. The proposed scope of work is for the installation of electric vehicle (ev) charging infrastructure at an existing gas station. the objective is to integrate ev charging capabilities while maintaining safe and continuous operation of the facility

    The proposed scope of work is for the installation of electric vehicle (ev) charging infrastructure at an existing gas station. the objective is to integrate ev charging capabilities while maintaining safe and continuous operation of the facility

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-001786
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Zo bc the proposed scope of work is for the installation of electric vehicle (ev) charging infrastructure at the existing gas station located at [site address or name]. the objective is to integrate ev charging capabilities while maintaining safe and continuous operation of the facility

    Zo bc the proposed scope of work is for the installation of electric vehicle (ev) charging infrastructure at the existing gas station located at [site address or name]. the objective is to integrate ev charging capabilities while maintaining safe and continuous operation of the facility

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-26-000653
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 1739 S St Augustine Dr

What is being built at 1739 S St Augustine Dr?

City of Dallas permits indicate that EV charging infrastructure is planned at the existing gas station. The records do not list the number of chargers.

Is a new gas station being built at 1739 S St Augustine Dr?

The permits describe EV charging infrastructure at an existing gas station, not construction of a new gas station.

When were the EV charging permits filed?

The City of Dallas filed a commercial alteration addition permit on April 15, 2026, and a commercial electrical permit on April 24, 2026.

What are the permit numbers for the project at 1739 S St Augustine Dr?

The permits are COM-ALT-ADD-26-000653, filed April 15, 2026, and COM-ELC-26-001786, filed April 24, 2026.

How many EV chargers are planned at 1739 S St Augustine Dr?

The permit descriptions refer to EV charging infrastructure but do not specify how many chargers are planned.

When will the EV chargers be available at 1739 S St Augustine Dr?

The permit records do not provide a construction schedule or an opening date for the charging infrastructure.