1821 S St Augustine Dr
Dallas, TX 75217 · Auto Services Center
New commercial construction gets plumbing and electrical permits
Permits indicate new commercial construction at 1821 S St Augustine Dr, with a plumbing rough-in permit filed January 5, 2026, and an electrical permit filed January 11, 2026. Later permits cover electrical service repair and renewing the meter base to 300 amps, filed July 27 and August 3, 2026.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Aug 3, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Aug 3, 2026
- since Sep 19, 2024
- Largest scope
- 1,950 sf
- Estimated cost
- $150K
- state registration
Where this project stands
Finishing up · inspection nextAuto Services Center
1,950 sq ft · $150K est.
- RegisteredSep 19, 2024
- Plan review
- ConstructionOct '24 – Jan '25
- Inspectednow
- Closed
Scheduled to finish Jan 1, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
5 projectsNew metal building — auto services center
TDLR project registrationNew ConstructionReview Complete1,950 sq ft$150K est.- Project #
- TABS2025001371
- Tenant / owner
- Auto Services Center
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 1821 S St Augustine Dr
What is being built at 1821 S St Augustine Dr in Dallas?
City of Dallas permits describe new commercial construction, with plumbing rough-in and electrical work. The records do not specify the building’s use.
When was construction permitted at 1821 S St Augustine Dr?
The plumbing rough-in permit, COM-PLM-26-000013, was filed January 5, 2026. An electrical permit for new commercial construction, COM-ELC-26-000146, followed on January 11, 2026.
What electrical work is planned at 1821 S St Augustine Dr?
The permits include electrical work for new commercial construction, an electrical service repair, and renewal of the meter base to 300 amps. The service repair was filed July 27, 2026, and the meter-base permit was filed August 3, 2026.
Is a new business opening at 1821 S St Augustine Dr?
The available City of Dallas records describe commercial construction and plumbing and electrical work, but do not name a business or confirm an opening.
What does the 300-amp permit at 1821 S St Augustine Dr cover?
Permit COM-ELC-26-003551, filed August 3, 2026, describes renewing the meter base to 300 amps.
Also being built nearby
All of 75217- 1739 S St Augustine DrApr 24, 2026The proposed scope of work is for the installation of electric vehicle (ev) charging infrastructure at an existing gas station. the objective is to integrate ev charging capabilities while maintaining safe and continuous operation of the facility · 135 m away
- 9519 Timberloam DrJan 28, 2021Interior remodel only · 189 m away
- 9722 Oakwood DrAug 17, 2026Roof replacement. tearing down to decking and istalling new roofing system. no plywood replacement needed · 190 m away
- 9607 Jo Pierce DrJan 22, 2021Construct new sfd · 280 m away
- 9634 Jo Pierce DrNov 16, 2020Gas test · 302 m away
- 1928 S St Augustine DrDec 11, 2025Repair gas leaks with test · 315 m away
- 9749 La Bett DrSep 17, 2020Electrical repairs · 361 m away
- 9480 Sandyland BlvdDec 4, 2025New construction · 376 m away
- 9724 Jo Pierce DrNov 24, 2020Electrical repairs · 397 m away
- 9470 Sandyland BlvdNov 18, 2025New construction · 397 m away
- 9733 Jo Pierce DrSep 22, 2026New 200 amps service and new wiring · 399 m away
- 1612 S St Augustine DrAug 11, 2025We will add 2 walls of commercial glass with aluminum frames and a door to close a small space · 412 m away