1915 Utica Dr
Dallas, TX 75217
Sewer and plumbing repairs permitted at 1915 Utica Dr
Residential permits at 1915 Utica Dr cover sewer system excavation and tunnel repair, pipe lining, and replacement and relocation of an electrical panel and meter. The latest permit, for sewer work, was issued March 16, 2026; the other filings were dated November 7 and August 5, 2025.
Summarized from City of Dallas records · updated Mar 16, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Mar 16, 2026
- since Aug 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 1915 Utica Dr
What work is permitted at 1915 Utica Dr in Dallas?
City of Dallas records show permits for sewer system excavation and tunnel repair, pipe lining to repair a line, and replacement and relocation of a panel and meter.
Is a new home being built at 1915 Utica Dr?
The records provided show residential plumbing and electrical work, not a new-home construction permit.
When was the latest permit filed for 1915 Utica Dr?
The latest listed permit is RES-PLM-26-002852, dated March 16, 2026, for sewer system excavation and tunnel repair.
What plumbing work is planned at 1915 Utica Dr?
Two City of Dallas residential plumbing permits are listed: one dated August 5, 2025, for pipe lining to repair a line, and one dated March 16, 2026, for sewer system excavation and tunnel repair.
Was electrical work permitted at 1915 Utica Dr?
Yes. Permit RES-ELC-25-004352, dated November 7, 2025, covers replacing and relocating a panel and meter.
Also being built nearby
All of 75217- 7936 Tillman StApr 14, 2026Installation of gas main from meter to house. will also ran new gas line for stove top and hot water heather · 48 m away
- 1944 Utica DrAug 19, 2026Replace 2.5 ton complete gas system · 69 m away
- 1818 Prichard LnJan 20, 2026Gas test & repair · 192 m away
- 7919 Huttig AveJan 19, 2026Electrical upgrade · 202 m away
- 8002 Umphress RdJul 7, 2025Fix the roof minor workbuilding 1-8 · 222 m away
- 7835 Tillman StMar 25, 2026Gas pressure test · 227 m away
- 8003 Huttig AveSep 4, 2026Remove and replace existing main electrical service panel with new 200-ampere main breaker panel. install new grounding electrode system with #4 copper grounding electrode conductor and ground rod, establishing proper electrical grounding per national electrical code (nec). this residence previously lacked a compliant grounding system. all work to comply with current nec standards and local electrical codes.panel replacement (200a)new grounding electrode system (#4 copper)the fact that it's a new grounding system for the homecode compliance · 231 m away
- 7831 Tillman StJun 23, 202660 gas line replacement · 234 m away
- 8017 Huttig AveSep 18, 2020Electrical remodel · 240 m away
- 7833 Seydel StAug 7, 2026Partial repipe of sewer under house · 243 m away
- 8095 Tillman StSep 12, 2025Installing new traffic signal at intersection buckner blvd at tillman st · 244 m away
- 1922 S Buckner BlvdJan 21, 2026Gas supply test and repair · 269 m away